Mostra el registre d'ítem simple

dc.contributorVan Wunnik, Lucas Philippe
dc.contributorShields, Herbert
dc.contributor.authorLlasera Casañas, Marc
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.coverage.spatialeast=-87.73583281371035; north=41.93922287435939; name=4330 W Belmont Ave, Chicago, IL 60641, Estats Units d'Amèrica
dc.date.accessioned2022-06-15T15:58:11Z
dc.date.issued2021-10-03
dc.identifier.urihttp://hdl.handle.net/2117/368518
dc.description.abstractThe current semiconductor shortage has implied delays in the supply of a range of products. It is also the case of the products researched in this thesis. This has involved deliveries of more than 1 year and increased supply costs. Companies have found themselves needing to look for cost reduction to maintain the same costs as always. This Thesis will focus on the material and labor costs reduction of the battery assembly production line at National Power Corp. based on analysis methodology. Actual line performance has been analyzed to disaggregate the processes implied as much as possible, to ease the understanding of the production process as a whole. Once the lines were analyzed, improvements were proposed to each of the batteries studied. These improvements have been scheduled based on the potential time reduced, difficulty and cost. A Gantt Diagram has been given as a resource for the company. Then, a new simulated analysis has been performed with the improvements implemented. A line balance with the improvements has been carried on the lines. Lastly, an economical study with the performance results of the improvements seen has been performed
dc.language.isoeng
dc.publisherUniversitat Politècnica de Catalunya
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses::Gestió i direcció
dc.subject.lcshManufacturing industries -- Chicago (Ill.)‏ -- Personnel management
dc.subject.lcshElectric batteries -- Construction -- Chicago (Ill.)‏ -- Economic aspects
dc.titleLabor and Materials Cost Reduction in Production Lines. Case Study in a Battery Pack Manufacturer
dc.typeMaster thesis
dc.subject.lemacIndústria manufacturera -- Chicago (Illinois) -- Personal -- Administració
dc.subject.lemacBateries elèctriques -- Fabricació -- Chicago (Illinois) -- Aspectes econòmics
dc.identifier.slugETSEIB-240.161717
dc.rights.accessRestricted access - author's decision
dc.date.lift10000-01-01
dc.date.updated2021-10-03T17:18:15Z
dc.audience.educationlevelMàster
dc.audience.mediatorEscola Tècnica Superior d'Enginyeria Industrial de Barcelona
dc.contributor.covenanteeIllinois Institute of Technology
dc.contributor.covenanteeNational Power Corporation


Fitxers d'aquest items

Imatge en miniatura

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple