Cerca
Ara es mostren els items 1-8 de 8
RWAKE - System Specification Document
(2016-10-06)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This report is the Deliverable 2.1 R-WAKE System Specification Document, which provides the compilation of high-levelR-Wake requirements, resulting from Task 2.1 activities. More specifically, this ...
SafeNcy - D5.1: Integrated Capability Test Plan V1
(2021-08-11)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This document provides a description of a formal integration and validation test plan for the SafeNcy system.
SafeNcy - D4.1: Trajectory Generation Solution Description
(2021-02-08)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This document provides a description of the automatic trajectory generation methodology. It describes the detailed modelling of the flight trajectory and the selection and ranking of the adopted methodology.
SafeNcy - D4.3: Trajectory Generation Validation Plan
(2021-05-06)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This document provides a description of initial validation test plan for the trajectory generation system.
SafeNcy - D2.1: Trade-off report on landing site selection and trajectory generation techniques
(2020-10-23)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This document provides the definitions of the models and algorithms used by the solutions developed in the context of the project. The document also describes the types and sources of data needed by the SafeNcy solution.
SafeNcy - D5.3: Integrated capability test report V1
(2021-12-29)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This document provides the results obtained during the execution of the formal integration and validation test plan for the SafeNcy system.
R-WAKE - System release 2 document
(2017-10-05)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This report represents deliverable D4.2 “System Release 2” of the R-WAKE project, which describes the final system resulting from WP4 (System Development) intended to support the research
objectives and scope to be addressed ...
SafeNcy - D1.2: Technical Requirements Document
(2020-04-28)
Report de recerca.
Accés restringit per acord de confidencialitat
Report de recerca.
Accés restringit per acord de confidencialitat
This document provides a description of all the technical resources identified in the WP1. It will specify the technical requirements in terms of problem environment high level modelling, constraints to address, and expected ...