Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
64.015 UPC academic works
You are here:
View Item 
  •   DSpace Home
  • Treballs acadèmics
  • Màsters oficials
  • Màster universitari en Enginyeria Química (Pla 2012)
  • View Item
  •   DSpace Home
  • Treballs acadèmics
  • Màsters oficials
  • Màster universitari en Enginyeria Química (Pla 2012)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Definition, design and start-up of an innovative wastewater treatment pilot plant for nutrients and energy recovery

Thumbnail
View/Open
TFM_Alvaro_Mayor_Pillado.pdf (2,934Mb)
Share:
 
  View Usage Statistics
Cita com:
hdl:2117/98403

Show full item record
Mayor Pillado, ÁlvaroMés informacióMés informació
Tutor / directorValderrama Angel, César AlbertoMés informacióMés informacióMés informació
Document typeMaster thesis
Date2016-10-05
Rights accessOpen Access
Attribution-NonCommercial-NoDerivs 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial-NoDerivs 3.0 Spain
Abstract
The present work is based on a real project developed by Cetaqua in collaboration with Avecom, a company devoted to steering and optimizing microbial processes. This work aims to study the feasibility of an innovative layout for a wastewater treatment plant (WWTP). This new point of view pretends to enable the plant to be self-sustainable, by increasing the sludge produced in a Pre-concentration step at the inlet of the WWTP, and therefore increasing the biogas produced in the anaerobic digester. In order to reach this goal, a revision of the state of art is carried out; furthermore there is a detailed description of methodology, which comprehends the definition, design and start-up of the pilot plant; the new WWTP is under demonstration due to the pilots already are in start-up phase. Economic feasibility is evaluated taking as a starting point the expected results of the project. Finally the most significant conclusions and lessons learned are summarized.
SubjectsSewage -- Purification -- Anaerobic treatment, Sewage disposal plants -- Energy consumption, Biogas, Aigües residuals -- Depuració -- Tractament anaeròbic, Aigües residuals -- Plantes de tractament -- Consum d'energia, Biogàs
DegreeMÀSTER UNIVERSITARI EN ENGINYERIA QUÍMICA (Pla 2012)
URIhttp://hdl.handle.net/2117/98403
Collections
  • Màsters oficials - Màster universitari en Enginyeria Química (Pla 2012) [121]
Share:
 
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
TFM_Alvaro_Mayor_Pillado.pdf2,934MbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina