Show simple item record

dc.contributor.authorBautista Valhondo, Joaquín
dc.contributor.authorCano Belman, Jaime
dc.contributor.authorPereira Gude, Jordi
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.date.accessioned2016-11-09T11:26:00Z
dc.date.issued2005
dc.identifier.citationBautista, J., Cano, J., Pereira, J. Minimizing work overload in mixed-model assembly lines. A: International Conference on Industrial Engineering and Systems Management. "e-Proceedings International Conference on Industrial Engineering and Systems Management IESM 2005". Marrakech: 2005, p. 1-10.
dc.identifier.isbn2-9600532-0-6
dc.identifier.urihttp://hdl.handle.net/2117/95938
dc.description.abstractA variant of the mixed-model sequencing problem on assembly lines is the one proposed by Yano and Rachamadugu. They consider time windows in workstations and the work overload concept (sum of differences between real completion time in the workstation and due dates, which depends on the time window value). This paper proposes some procedures for solving the problem, and compares them with others taken from literature using a computational experience.
dc.format.extent10 p.
dc.language.isoeng
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshAssembly-line methods
dc.subject.lcshOperations research
dc.subject.otherSequencing
dc.subject.otherWork Overload
dc.subject.otherJIT
dc.subject.otherHeuristics.
dc.titleMinimizing work overload in mixed-model assembly lines
dc.typeConference report
dc.subject.lemacAlgorismes
dc.subject.lemacTreball en cadena
dc.subject.lemacOptimització matemàtica
dc.contributor.groupUniversitat Politècnica de Catalunya. OPE - Organització de la Producció i d'Empresa (aspectes tècnics, jurídics i econòmics en Producció)
dc.relation.publisherversionhttp://www.i4e2.org/
dc.rights.accessRestricted access - publisher's policy
local.identifier.drac19240820
dc.description.versionPostprint (published version)
dc.date.lift10000-01-01
local.citation.authorBautista, J.; Cano, J.; Pereira, J.
local.citation.contributorInternational Conference on Industrial Engineering and Systems Management
local.citation.pubplaceMarrakech
local.citation.publicationNamee-Proceedings International Conference on Industrial Engineering and Systems Management IESM 2005
local.citation.startingPage1
local.citation.endingPage10


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record