Mostra el registre d'ítem simple

dc.contributor.authorBautista Valhondo, Joaquín
dc.contributor.authorSuárez Feijóo, Raúl
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.contributor.otherUniversitat Politècnica de Catalunya. Institut d'Organització i Control de Sistemes Industrials
dc.date.accessioned2016-09-05T11:48:07Z
dc.date.issued2009-11-17
dc.identifier.citationBautista, J., Suarez, R. Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies. A: "IEEE International Symposium on Assembly and Manufacturing, 2009. ISAM 2009". Los Alamitos (California): IEEE Computer Society Conference Publishing Services (CPS), 2009, p. 351-357.
dc.identifier.isbn978-1-4244-4627-8
dc.identifier.urihttp://hdl.handle.net/2117/89575
dc.description.abstractProceedings of T2B.3 2009 IEEE International Symposium on Assembly and Manufacturing 17-20 November 2009, Suwon, Korea 978-1-4244-4628-5/09/$25.00 ©2009 IEEE Mixed-model sequencing problem with overload minimization considering workstations dependencies Joaqu ́ ın Bautista and Ra ́ ul Su ́ arez Abstract — This paper reviews the formulation of the Mixed Model Sequencing Problem with Workload minimization (MMSP-W). Two significative models already presented in the literature are describe, showing that they are valid for the case of parallel workstations, but do not properly solve the case of serial workstations. After that, a new model is introduced that is valid for the case of serial workstations. An example is used to illustrate the performance of all the models, and a computational experience was done to verify the applicability of the proposed model using the solver CPLEX and a set of problem instances of small dimension adapted from the literature.
dc.format.extent7 p.
dc.language.isoeng
dc.publisherIEEE Computer Society Conference Publishing Services (CPS)
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshJust-in-time-systems
dc.subject.otherWorkstations
dc.subject.otherManufacturing processes
dc.subject.otherPulp manufacturing
dc.subject.otherVirtual manufacturing
dc.subject.otherComputational modeling
dc.subject.otherRobots
dc.subject.otherRobotic assembly
dc.subject.otherProduction facilities
dc.subject.otherMeasurement units
dc.subject.otherParticle measurements
dc.titleMixed-Model Sequencing Problem with overload minimization considering workstations dependencies
dc.typePart of book or chapter of book
dc.subject.lemacJust a temps (Sistema)
dc.subject.lemacTreball -- Productivitat
dc.contributor.groupUniversitat Politècnica de Catalunya. OPE - Organització de la Producció i d'Empresa (aspectes tècnics, jurídics i econòmics en Producció)
dc.contributor.groupUniversitat Politècnica de Catalunya. SIR - Service and Industrial Robotics
dc.relation.publisherversionhttp://ieeexplore.ieee.org/xpl/mostRecentIssue.jsp?punumber=5367681
dc.rights.accessRestricted access - publisher's policy
local.identifier.drac18849197
dc.description.versionPostprint (published version)
dc.date.lift10000-01-01
local.citation.authorBautista, J.; Suarez, R.
local.citation.pubplaceLos Alamitos (California)
local.citation.publicationNameIEEE International Symposium on Assembly and Manufacturing, 2009. ISAM 2009
local.citation.startingPage351
local.citation.endingPage357


Fitxers d'aquest items

Imatge en miniatura

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple