Mostra el registre d'ítem simple

dc.contributor.authorBautista Valhondo, Joaquín
dc.contributor.authorAlfaro Pozo, Rocío
dc.contributor.authorBatalla García, Cristina
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.date.accessioned2016-07-25T09:31:14Z
dc.date.available2016-07-25T09:31:14Z
dc.date.issued2016
dc.identifier.citationBautista, J., Alfaro, R., Batalla, C. Minimizing lost-work costs in a mixed-model assembly line. A: International Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference. "CIO-ICIEOM-IISE-AIM International Joint Conference (IJC2016)". San Sebastián: Universidad de Navarra, 2016, p. 3.
dc.identifier.isbn978-84-8081-494-2
dc.identifier.urihttp://hdl.handle.net/2117/89114
dc.description.abstractMixed-model assembly lines present two issues due to differences in processing times from product types; these issues are the work overload or unfinished work and the useless time or unproductive time. Within this context, we present, in this paper, a new mathematical model for the mixed-model sequencing problem. This model minimizes the costs by lost production and idle productive time. The model also allows processors carry out their workload with a factor activity greater than the normal, in order to reduce the work overload if it is necessary. Obviously it is also considered to provide economic compensation to workers based on their level of activation. Finally, the model is evaluated by a computational experience linked to a real case from the automotive industry.
dc.format.extent1 p.
dc.language.isoeng
dc.publisherUniversidad de Navarra
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshAssembly-line methods
dc.subject.otherAssembly line
dc.subject.otherSequencing
dc.subject.otherWork overload
dc.subject.otherUseless time
dc.subject.otherCosts
dc.titleMinimizing lost-work costs in a mixed-model assembly line
dc.typeConference lecture
dc.subject.lemacTreball en cadena
dc.subject.lemacTreball -- Productivitat
dc.contributor.groupUniversitat Politècnica de Catalunya. OPE - Organització de la Producció i d'Empresa (aspectes tècnics, jurídics i econòmics en Producció)
dc.identifier.doi10.13140/RG.2.1.1009.5606/1
dc.identifier.dlNA 866-2016
dc.rights.accessOpen Access
local.identifier.drac18772005
dc.description.versionPostprint (published version)
dc.relation.projectidinfo:eu-repo/grantAgreement/MINECO//TIN2014-57497-P/ES/FACTOR HUMANO E INCERTIDUMBRE SOBRE LA SECUENCIACION Y EL EQUILIBRADO EN LINEAS DE MODELOS MIXTOS/
local.citation.authorBautista, J.; Alfaro, R.; Batalla, C.
local.citation.contributorInternational Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference
local.citation.pubplaceSan Sebastián
local.citation.publicationNameCIO-ICIEOM-IISE-AIM International Joint Conference (IJC2016)
local.citation.startingPage3
local.citation.endingPage3


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple