Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
59.755 UPC E-Prints
You are here:
View Item 
  •   DSpace Home
  • E-prints
  • Departaments
  • Departament de Física
  • Articles de revista
  • View Item
  •   DSpace Home
  • E-prints
  • Departaments
  • Departament de Física
  • Articles de revista
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Development and assessment of fire-related risk unavailability matrices to support the application of the maintenance rule in a PWR nuclear power plant

Thumbnail
View/Open
Postprint (217,0Kb)
Share:
 
 
10.1080/00223131.2016.1193066
 
  View Usage Statistics
Cita com:
hdl:2117/88442

Show full item record
Díaz Bayona, Pedro
Estruch Traveria, Enric
Dies Llovera, JavierMés informacióMés informació
Tapia Fernández, CarlosMés informació
Blas del Hoyo, Alfredo deMés informacióMés informacióMés informació
Asamoah, Matthew
Document typeArticle
Defense date2016-06-17
Rights accessOpen Access
Attribution-NonCommercial-NoDerivs 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial-NoDerivs 3.0 Spain
Abstract
Two methods are presented which serve to incorporate the fire-related risk into the current practices in nuclear power plants with respect to the assessment of configurations. The development of these methods is restricted to the compulsory use of fire probabilistic safety assessment (PSA) models. The first method is a fire protection systems and key safety functions unavailability matrix which is developed to identify structures, systems, and components significant for fire-related risk. The second method is a fire zones and key safety functions (KSFs) fire risk matrix which is useful to identify fire zones which are candidates for risk management actions. Specific selection and quantification methodologies have been developed to obtain the matrices. The Monte Carlo method has been used to assess the uncertainty of the unavailability matrix. The analysis shows that the uncertainty is sufficiently bounded. The significant fire-related risk is localized in six KSF representative components and one fire protection system which should be included in the maintenance rule. The unavailability of fire protection systems does not significantly affect the risk. The fire risk matrix identifies the fire zones that contribute the most to the fire-related risk. These zones belong to the control building and electric penetrations building.
CitationDiaz, P., Estruch, E., Dies, J., Tapia, C., de Blas, A., Asamoah, M. Development and assessment of fire-related risk unavailability matrices to support the application of the maintenance rule in a PWR nuclear power plant. "Journal of nuclear science and technology", 17 Juny 2016, p. 1-16. 
URIhttp://hdl.handle.net/2117/88442
DOI10.1080/00223131.2016.1193066
ISSN0022-3131
Publisher versionhttp://www.tandfonline.com/doi/full/10.1080/00223131.2016.1193066
Collections
  • Departament de Física - Articles de revista [1.909]
  • Departament de Física i Enginyeria Nuclear (fins octubre 2015) - Articles de revista [603]
  • NERG - Grup de Recerca d'Enginyeria Nuclear - Articles de revista [21]
Share:
 
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
PaperJNSTver_AM.pdfPostprint217,0KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina