Power plant control in large-scale photovoltaic plants: Design, implementation and validation in a 9.4 MW photovoltaic plant
Visualitza/Obre
Cita com:
hdl:2117/88080
Tipus de documentArticle
Data publicació2016-01-01
Condicions d'accésAccés obert
Llevat que s'hi indiqui el contrari, els
continguts d'aquesta obra estan subjectes a la llicència de Creative Commons
:
Reconeixement-NoComercial-SenseObraDerivada 3.0 Espanya
Abstract
© The Institution of Engineering and Technology 2016.
This study proposes an algorithm for active and reactive power management in large photovoltaic (PV) power plants. The algorithm is designed in order to fulfil the requirements of the most demanding grid codes and combines the utilisation of the PV inverters, fixed switched capacitors and static synchronous compensators. The control algorithm is simulated as required by the grid codes and validated on a real 9.4 MW PV power plant.
CitacióBullich, E., Ferrer, R., Aragüés, M., Serrano, L., Pacheco, C., Gomis-Bellmunt, O. Power plant control in large-scale photovoltaic plants: Design, implementation and validation in a 9.4 MW photovoltaic plant. "IET renewable power generation", 01 Gener 2016, vol. 10, p. 50-62.
ISSN1752-1416
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
PowerPlantControl.pdf | 1,330Mb | Visualitza/Obre |