An empirical study on project management of reconstruction after disaster based on interpretation system
dc.contributor.author | Zhou, Jun |
dc.contributor.author | Wang, Hanzhao |
dc.date.accessioned | 2016-03-17T11:56:21Z |
dc.date.available | 2016-03-17T11:56:21Z |
dc.date.issued | 2015-12 |
dc.identifier.citation | Zhou, Jun; Wang, Hanzhao. An empirical study on project management of reconstruction after disaster based on interpretation system. "Journal of Industrial Engineering and Management", Desembre 2015, vol. 8, núm. 5, p. 1409-1427. |
dc.identifier.issn | 2013-0953 |
dc.identifier.uri | http://hdl.handle.net/2117/84608 |
dc.description.abstract | Purpose: Recently natural disasters frequently occur all over the world. However, the stakeholder management of post-disaster reconstruction is often a neglected field because of its particularity. This study investigates a model of stakeholder management for managers in post-disaster reconstruction project. Design/methodology/approach: Based on the interpretation system model, this study makes a deep analysis of the stakeholder management of post-disaster reconstruction with the case of reconstruction project in Wenchuan. Findings: The results reveal that the managers should take divergent actions to collect data of stakeholders in different situations. The discovering mode is suitable in a simple stakeholder environment and the undirected viewing mode is suitable in a relatively complex environment. Practical implications: This paper establishes a scientific archived management report of the stakeholders in Wenchuan reconstruction project to provide the suggestions and the experiences for the future projects. Originality/value: Past stakeholder management models are not suitable in reconstruction project because of its particularity. This study takes interpretation system as a new model for stakeholder management in reconstruction project, allowing managers to take the optimal actions in different stakeholder environment. |
dc.format.extent | 19 p. |
dc.language.iso | eng |
dc.publisher | OmniaScience |
dc.rights | Attribution-NonCommercial 3.0 Spain |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/3.0/es/ |
dc.subject | Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions |
dc.subject.lcsh | Natural disasters -- Management |
dc.subject.lcsh | Emergency management |
dc.subject.other | Post-disaster reconstruction |
dc.subject.other | Project management |
dc.subject.other | Stakeholder management |
dc.subject.other | Interpretation system |
dc.title | An empirical study on project management of reconstruction after disaster based on interpretation system |
dc.type | Article |
dc.subject.lemac | Catàstrofes naturals -- Aspectes econòmics |
dc.subject.lemac | Gestió d'emergències |
dc.identifier.dl | B-28744-2008 |
dc.description.peerreviewed | Peer Reviewed |
dc.rights.access | Open Access |
local.citation.publicationName | Journal of Industrial Engineering and Management |
local.citation.volume | 8 |
local.citation.number | 5 |
local.citation.startingPage | 1409 |
local.citation.endingPage | 1427 |
Files in this item
This item appears in the following Collection(s)
-
2015, vol. 8, núm. 5 [23]
Except where otherwise noted, content on this work
is licensed under a Creative Commons license
:
Attribution-NonCommercial 3.0 Spain