Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement
Visualitza/Obre
Estadístiques de LA Referencia / Recolecta
Inclou dades d'ús des de 2022
Cita com:
hdl:2117/78765
Tipus de documentReport de recerca
Data publicació2015-10-29
Condicions d'accésAccés obert
Llevat que s'hi indiqui el contrari, els
continguts d'aquesta obra estan subjectes a la llicència de Creative Commons
:
Reconeixement-NoComercial-SenseObraDerivada 3.0 Espanya
Abstract
Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come from collective agreements and therefore must be respected by both company and labor unions. The first model takes into account the saturation limit of the workstations, and the second model also includes the activation of the operators throughout the working day. Two computational experiments were carried out using a case study of the Nissan motor plant in Barcelona with two main objectives: (1) to study the repercussions of the saturation limit on the decrease in productivity on the line and (2) to evaluate the recovery of productivity on the line via both activation of operators, while maintaining the same quality in working conditions achieved by limiting the saturation, and auxiliary processors. By results we state that saturation limitation leads an important increase of work overload, which means average economic losses of 28,731.8 Euros/day. However, the productivity reduction may be counteracted by the work pace factor increase, at certain moments of workday, and/or by the incorporation of auxiliary processors into the line.
Descripció
Postprint ESWA Volume 42, Issue 22, 1 December 2015, Pages 8896–8910
CitacióBautista, J., Alfaro, R., Batalla, C. "Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement". 2015.
Forma partOPE-WP.2015/08 (20151029)
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
ESWA_WP_v2.pdf | 36,03Mb | Visualitza/Obre |