Mostra el registre d'ítem simple

dc.contributorSerrat Piè, Carles
dc.contributorFerrer Biosca, Alberto
dc.contributor.authorRao Rachakonda, Satyanarayana
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament de Matemàtica Aplicada I
dc.coverage.spatialeast=72.7093466; north=21.0837964; name=Sultanabad, Surat, Gujarat 394550, Índia
dc.date.accessioned2015-10-01T11:34:56Z
dc.date.available2015-10-01T11:34:56Z
dc.date.issued2015-07-06
dc.identifier.urihttp://hdl.handle.net/2117/77242
dc.description.abstractENGLISH: A construction of an asset is challenging work associated with huge responsibilities. Project manager’s main challenges in construction are generally Time-Cost-Quality dependent. In addition to these factors, Project Managers or construction Manager have to deal with numerous uncertainties in the process of construction. Considering its diverse nature and activity performed in construction. Here major role playing factor in success of a project is efficient scheduling of the construction project. While scheduling a project, the factors which are considered are mostly tangible, such as resources, labor and capital. My main objective in this research is to reduce the duration of the activity involved in construction, while considering qualitative factors like site organization, Labor Skills and quality of equipment used and reveal the effect of these tangible factors on duration of the project. Since these factors are difficult to be measured using classical mathematic theories. We have opted Fuzzy Logic Theory as our base, which can measure mathematically with use of Fuzzy Logic Tool Box in MATLAB®. In order to implement the proposed technique, various membership functions need to be estimated using judgement and guidance of experts. One of the main advantage of the proposed technique is that it can be easily implemented in existing computer programs and thus having a possibility to schedule a project efficiently.
dc.language.isoeng
dc.publisherUniversitat Politècnica de Catalunya
dc.rightsAttribution-NonCommercial-ShareAlike 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Matemàtiques i estadística::Lògica matemàtica
dc.subjectÀrees temàtiques de la UPC::Edificació
dc.subject.lcshFuzzy logic
dc.subject.lcshBuilding
dc.titleFuzzy logic integration into construction management planning
dc.typeMaster thesis
dc.subject.lemacLògica difusa
dc.subject.lemacConstrucció
dc.rights.accessOpen Access
dc.audience.educationlevelMàster
dc.audience.mediatorEscola Politècnica Superior d'Edificació de Barcelona
dc.audience.degreeMÀSTER UNIVERSITARI EN EDIFICACIÓ (Pla 2009)


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple