Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
59.588 UPC E-Prints
You are here:
View Item 
  •   DSpace Home
  • E-prints
  • Centres de recerca
  • BSC - Barcelona Supercomputing Center
  • Computer Sciences
  • Ponències/Comunicacions de congressos
  • View Item
  •   DSpace Home
  • E-prints
  • Centres de recerca
  • BSC - Barcelona Supercomputing Center
  • Computer Sciences
  • Ponències/Comunicacions de congressos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Modular workload format: Extending SWF for modular systems

Thumbnail
View/Open
JSSPP_2021_paper_16.pdf (270,3Kb)
Share:
 
 
10.1007/978-3-030-88224-2_3
 
  View Usage Statistics
Cita com:
hdl:2117/378245

Show full item record
Corbalán González, JulitaMés informacióMés informacióMés informació
D'Amico, MarcoMés informació
Document typeConference report
Defense date2021
PublisherSpringer
Rights accessOpen Access
All rights reserved. This work is protected by the corresponding intellectual and industrial property rights. Without prejudice to any existing legal exemptions, reproduction, distribution, public communication or transformation of this work are prohibited without permission of the copyright holder
Abstract
This paper presents the Modular Workload Format (MWF), a proposal for extending the widely accepted Standard Workload Format (SWF) for job scheduling evaluation. David Talby and Dror Feitelson proposed the SWF in 1999, allowing to describe data center workload in a synthesized way. Its simplicity, representing each job by a single line in a text file and including details to make job scheduling evaluation quite accurate, was part of its success. Using these years’ experience but considering new system and workload characteristics, we propose an extension to support multiple steps in a single job, heterogeneous jobs, and relevant inputs not covered by the SWF as energy/power references. The goal of this contribution is to adapt the SWF to current trends in architectures and workloads. Moreover, we propose a simple approach for converting any already existing SWF trace file into an MWF trace file to be able to reuse already existing traces.
CitationCorbalan, J.; D'Amico, M. Modular workload format: Extending SWF for modular systems. A: Workshop on Job Scheduling Strategies for Parallel Processing. "Job Scheduling Strategies for Parallel Processing: 24th International Workshop, JSSPP 2021: virtual event, May 21, 2021: revised selected papers". Berlín: Springer, 2021, p. 43-55. ISBN 978-3-030-88224-2. DOI 10.1007/978-3-030-88224-2_3. 
URIhttp://hdl.handle.net/2117/378245
DOI10.1007/978-3-030-88224-2_3
ISBN978-3-030-88224-2
Publisher versionhttps://link.springer.com/chapter/10.1007/978-3-030-88224-2_3
Collections
  • Computer Sciences - Ponències/Comunicacions de congressos [497]
  • Departament d'Arquitectura de Computadors - Ponències/Comunicacions de congressos [1.841]
Share:
 
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
JSSPP_2021_paper_16.pdf270,3KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina