Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: water pipeline case study in Chongqing
View/Open
Postprint version (7,870Mb) (Restricted access)
Request copy
Què és aquest botó?
Aquest botó permet demanar una còpia d'un document restringit a l'autor. Es mostra quan:
- Disposem del correu electrònic de l'autor
- El document té una mida inferior a 20 Mb
- Es tracta d'un document d'accés restringit per decisió de l'autor o d'un document d'accés restringit per política de l'editorial
Cita com:
hdl:2117/367461
Document typeArticle
Defense date2022-05
Rights accessRestricted access - publisher's policy
(embargoed until 2024-02-20)
Except where otherwise noted, content on this work
is licensed under a Creative Commons license
:
Attribution-NonCommercial-NoDerivs 4.0 International
Abstract
This paper summarises the main technical problems that have been encountered in the Chongqing Guanjingkou Water Conservancy Project, which is the first ultra-long-distance rock pipe jacking (PJ) project in China’s water conservancy industry. These challenges include pipe sticking, pipe cracking, and jacking machine cutter head sticking. Geological conditions, bentonite mud, sediment, intermediate jacking station, pipe production, and pipe misalignment in the ultra-long-distance rock PJ project were analysed in detail. Based on the analysis, countermeasures were formulated and implemented into the Guanjingkou Hydraulic Project. The research results are anticipated to be advantageous for future ultra-long-distance rock PJ projects.
CitationDeng, Z. [et al.]. Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: water pipeline case study in Chongqing. "Tunnelling and underground space technology", Maig 2022, vol. 123, p. 104420:1-104420:22.
ISSN0886-7798