Validation and Verification for Model-Based Aircraft System Development
View/Open
Budget.pdf (80,71Kb) (Restricted access)
TFM_Report_TIO_MALO.pdf (2,547Mb) (Restricted access)
Autoinforme de qualitat.pdf (323,5Kb) (Restricted access)
Cita com:
hdl:2117/360339
Tutor / directorRieux, Gilles; Chaudemar, Jean-Charles; Castillo Grimalt, Joan Antoni; García-Almiñana, Daniel




CovenanteeAirbus
Document typeMaster thesis
Date2021-06-02
Rights accessRestricted access - author's decision
All rights reserved. This work is protected by the corresponding intellectual and industrial
property rights. Without prejudice to any existing legal exemptions, reproduction, distribution, public
communication or transformation of this work are prohibited without permission of the copyright holder
Abstract
The internship is within the sine of the IYISI department (Overall Systems VV and
Integration) of Airbus. The department is in charge to de ne the process of system's product
V&V and monitor its deployment. Due to the COVID-19 crisis the content and organization
of the internship had to be heavily altered. With the duration of the internship reduced from
six to four months and the partial unemployment at 80%, limit the extent of the internship
that turned around two main tasks.
Firstly, the automatization of the production of certain KPIs (Performance indicators).
The sometimes slow production of this indicators used to be in charge of the subcontracted
companies. However, with the health crisis that heavily impacted the commercial aviation
sector, a lot of contracts with these companies had stopped. For this reason, in Airbus an
improvement of the production of this indicators was needed in order to obtain them faster
and e ciently. In addition, Airbus is migrating their processes and data to Google Suite
which requires an imminent change in all disciplines.
Secondly, the internship was more focused in the design and development of a new method
to get the data from the designers of each system of the aircraft to manage the integration
operations that involve many on these systems. This data contains the functional content
of each system as well as the dates of the di erent milestones it has to achieve before being
certi ed. These information permit to optimize the systems test preparation and duration
in Airbus Facilities.
SubjectsSystems engineering, Airplanes -- Design and construction, Process control, Airbus aircraft, Enginyeria de sistemes, Avions -- Disseny i construcció, Control de processos, Airbus (Avions)
DegreeMÀSTER UNIVERSITARI EN ENGINYERIA AERONÀUTICA (Pla 2014)
Collections
Files | Description | Size | Format | View |
---|---|---|---|---|
Budget.pdf![]() | 80,71Kb | Restricted access | ||
TFM_Report_TIO_MALO.pdf![]() | 2,547Mb | Restricted access | ||
Autoinforme de qualitat.pdf![]() | 323,5Kb | Restricted access |