Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
60.627 UPC E-Prints
You are here:
View Item 
  •   DSpace Home
  • E-prints
  • Grups de recerca
  • SCOM - Supply Chain and Operations Management
  • Articles de revista
  • View Item
  •   DSpace Home
  • E-prints
  • Grups de recerca
  • SCOM - Supply Chain and Operations Management
  • Articles de revista
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Existence and sizing of buffers in parallel assembly lines with multi-line workstations and different cycle times

Thumbnail
View/Open
10070_ENGLISH.pdf (672,8Kb)
Share:
 
 
10.6036/MN10070
 
  View Usage Statistics
Cita com:
hdl:2117/351943

Show full item record
Aguilar Gamarra, Harry NickMés informacióMés informació
Pastor Moreno, RafaelMés informacióMés informacióMés informació
García Villoria, AlbertoMés informacióMés informacióMés informació
Document typeArticle
Defense date2021-04-21
Rights accessOpen Access
Attribution-NonCommercial-NoDerivs 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial-NoDerivs 3.0 Spain
Abstract
Parallel Assembly Lines with multi-line stations (PALBs) have been widely studied in recent years because PALBs can help improve the efficiency of a production system. However, the need of buffers has not been considered in the PALBP literature. In this study, for the first time in the literature, it is shown and demonstrated the need to consider the use of buffers in this type of line when their cycle times are different. Moreover, the buffer sizing problem in a multi-line workstation is presented and formalized. It is shown that the sequencing and scheduling of the task influences the buffer size. Finally, the designed resolution method is shown: solve a mixed integer linear programming model with a commercial software, with the objective of minimizing the size of the buffers.
CitationAguilar, H.; Pastor, R.; García-Villoria, A. Existence and sizing of buffers in parallel assembly lines with multi-line workstations and different cycle times. "Dyna management", 21 Abril 2021, vol. 9, núm. 1, p. 1-10. 
URIhttp://hdl.handle.net/2117/351943
DOI10.6036/MN10070
ISSN2340-6585
Publisher versionhttps://www.dyna-management.com/search-content-2/existence-and-sizing-of-buffers-in-parallel-assembly-lines-with-multi-line-workstations-and-differen
Collections
  • SCOM - Supply Chain and Operations Management - Articles de revista [66]
  • Doctorat en Cadena de Subministrament i Direcció d'Operacions - Articles de revista [7]
  • Departament d'Organització d'Empreses - Articles de revista [788]
Share:
 
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
10070_ENGLISH.pdf672,8KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina