Mostra el registre d'ítem simple

dc.contributor.authorRibas Vila, Immaculada
dc.contributor.authorCompanys Pascual, Ramón
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.date.accessioned2021-04-21T06:58:53Z
dc.date.available2021-04-21T06:58:53Z
dc.date.issued2021-01-22
dc.identifier.citationRibas, I.; Companys, R. A computational evaluation of constructive heuristics for the parallel blocking flow shop problem with sequence-dependent setup times. "International journal of industrial engineering computations", 22 Gener 2021, vol. 12, núm. 3, p. 321-328.
dc.identifier.issn1923-2934
dc.identifier.urihttp://hdl.handle.net/2117/344033
dc.description.abstractThis paper deals with the problem of scheduling jobs in a parallel flow shop environment without buffers between machines and with sequence-dependent setup times in order to minimize the maximum completion time of jobs. The blocking constraint normally leads to an increase in the maximum completion time of jobs due to the blockage of machines, which can increase even more so when setup times are considerable. Hence, the heuristic to solve this problem must take into account these specificities in order to minimize the timeout of machines. Because the procedures designed to solve the parallel flow shop scheduling problem must deal not only with the sequencing of jobs but also with their allocation to the flow shops, 36 heuristics have been tested in this paper, of which 35 combine sequencing rules with allocation methods while the last one takes a different approach that is more related to the nature of this problem. The computational evaluation of the implemented heuristics showed good performance of the heuristic designed especially for the problem (RCP0) when the setup times are considerable. Furthermore, the evaluation has also allowed us to propose a combined heuristic that leads to good solutions in a short CPU time.
dc.format.extent8 p.
dc.language.isoeng
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshParallel processing (Electronic computers)
dc.subject.lcshMathematical optimization
dc.subject.otherBlocking
dc.subject.otherParallel flow shop
dc.subject.otherDistributed flow shop
dc.subject.otherDependent setup times
dc.subject.otherMakespan
dc.titleA computational evaluation of constructive heuristics for the parallel blocking flow shop problem with sequence-dependent setup times
dc.typeArticle
dc.subject.lemacProcessament en paral·lel (Ordinadors)
dc.subject.lemacOptimització matemàtica
dc.contributor.groupUniversitat Politècnica de Catalunya. SCOM - Supply Chain and Operations Management
dc.identifier.doi10.5267/j.ijiec.2021.1.004
dc.description.peerreviewedPeer Reviewed
dc.relation.publisherversionhttp://growingscience.com/beta/ijiec/4775-a-computational-evaluation-of-constructive-heuristics-for-the-parallel-blocking-flow-shop-problem-with-sequence-dependent-setup-times.html
dc.rights.accessOpen Access
local.identifier.drac30467330
dc.description.versionPostprint (author's final draft)
local.citation.authorRibas, I.; Companys, R.
local.citation.publicationNameInternational journal of industrial engineering computations
local.citation.volume12
local.citation.number3
local.citation.startingPage321
local.citation.endingPage328


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple