Estudi de viabilitat d'un col·lector de salmorres per a la dissolució dels dipòsits salins del Bages amb captació d'aigua de mar
dc.contributor | Sanmiquel Pera, Lluís |
dc.contributor | Oliveras Mejías, Jordi |
dc.contributor.author | Puig Rufas, Eduard |
dc.contributor.other | Universitat Politècnica de Catalunya. Departament d'Enginyeria Minera, Industrial i TIC |
dc.coverage.spatial | east=1.8815602; north=41.80734630000001; name=Unnamed Road, 08650 Sallent, Barcelona, Espanya |
dc.date.accessioned | 2021-04-07T08:10:32Z |
dc.date.issued | 2020-06-19 |
dc.identifier.uri | http://hdl.handle.net/2117/343182 |
dc.description.abstract | El present projecte neix de la necessitat d’evacuar el material salí provinent de les mines potàssiques de la Catalunya central. Fins l’actualitat el material salí s’ha estat acumulant en els dipòsits salins del Fusteret i el Cogulló. Aquests dipòsits tenen una capacitat limitada, per la qual cosa és necessari un pla per a extreure aquet material amb la finalitat d’enfocar el creixement cap a una mineria sostenible i amb compromís amb la societat i el medi ambient. L’objectiu és valorar tècnica i econòmicament la viabilitat d’una infraestructura hidràulica dissenyada per tal de transportar aigua marina fins la conca potàssica del Bages, dissoldre el material salí, i transportar-lo novament fins el mar. El procés s’inicia al Baix Llobregat, on es capta l’aigua marina mitjançant drens subterranis i s’acumula a una gran bassa de regulació. En aquest punt s’eleva l’aigua marina a través de 4 estacions de bombeig, paral·lelament al riu Llobregat fins a la bassa de regulació de Castellgalí. A partir d’aquí es reparteix el caudal en dos branques, una seguint el riu Cardener fins a la població de Súria amb 3 estacions de bombeig i l’altre seguint pel riu Llobregat fins a Sallent amb 2 estacions de bombeig més. Es preveu una dissolució de 200 grams de material salí per cada litre d’aigua de mar, convertint-se en salmorra. En aquest punt la salmorra s’evacua per un col·lector paral·lel al de elevació de l’aigua de mar. Al llarg del recorregut és necessari col·locar torres i arquetes de trencament de càrrega per tal de mantenir un nivell de pressions òptim. El resultat de l’estudi ens indica que el sistema permetria dissoldre, amb un temps de 60 anys, el dipòsit salí del Cogulló i tot el material provinent d’ambdues mines, pel que es deixaria d’abocar al dipòsit del Fusteret. El material total dissolt comparat amb el preu total calculat, resulta un cost de 2,55 € per tona dissolta. |
dc.description.abstract | This project arises from the need to evacuate the salt material from the potash mines of central Catalonia. Until now the saline material has been accumulating on the saline deposits of the Fusteret and the Cogulló. These deposits have a limited capacity, so a plan is necessary in order to extract this material with the aim of growth towards sustainable mining and with commitment to society and the environment. The objective is to evaluate the technical and economical viability of a hydraulic infrastructure designed to transport seawater to the potash basin of Bages, dissolve the saline material and transport it again to the sea. The process begins in the Baix Llobregat, which captures the seawater through underground drains and accumulates in a large regulation pond. From this point the sea water rises through 4 pumping stations, parallel to the Llobregat river to the Castellgalí regulation pond. From here, the caudal is distributed in two branches, one following the Cardener River to the town of Súria with 3 pumping stations, and the other following the Llobregat river to Sallent with 2 pumping stations. It provides a dissolution of 200 grams of saline material per liter of seawater, becoming brine. At this point the brine is evacuated with a parallel collector parallel to the elevation of seawater. Along the route it is necessary to place surge towers and manhole to maintain an optimum level of pressure. The result of the study indicates that the system would allow in a timeframe of 60 years the dissolution of the salt deposit of Cogulló and all the material from both mines, so it would be left to pour into the Fusteret deposit. The total dissolved material compared to the total price calculated, gives a cost of € 2.55 per dissolved ton. |
dc.language.iso | cat |
dc.publisher | Universitat Politècnica de Catalunya |
dc.subject | Àrees temàtiques de la UPC::Enginyeria civil::Enginyeria de mines |
dc.subject | Àrees temàtiques de la UPC::Desenvolupament humà i sostenible::Enginyeria ambiental |
dc.subject.lcsh | Mineral industries -- Waste disposal |
dc.subject.lcsh | Abandoned mined lands reclamation |
dc.subject.lcsh | Salt mine and mining -- Environmental aspects |
dc.title | Estudi de viabilitat d'un col·lector de salmorres per a la dissolució dels dipòsits salins del Bages amb captació d'aigua de mar |
dc.type | Bachelor thesis |
dc.subject.lemac | Indústria minera -- Residus -- Eliminació |
dc.subject.lemac | Restauració d'espais afectats per activitats extractives |
dc.subject.lemac | Salines -- Bages -- Aspectes ambientals |
dc.identifier.slug | PRISMA-155024 |
dc.rights.access | Restricted access - author's decision |
dc.date.lift | 10000-01-01 |
dc.date.updated | 2020-12-15T13:03:37Z |
dc.audience.educationlevel | Grau |
dc.audience.mediator | Escola Politècnica Superior d'Enginyeria de Manresa |
dc.audience.degree | GRAU EN ENGINYERIA MINERA (Pla 2016) |