Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
13.660 Articles in journals published by the UPC
You are here:
View Item 
  •   DSpace Home
  • Revistes
  • JIEM: Journal of Industrial Engineering and Management
  • 2020, vol. 13, núm. 3
  • View Item
  •   DSpace Home
  • Revistes
  • JIEM: Journal of Industrial Engineering and Management
  • 2020, vol. 13, núm. 3
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Integrated employee scheduling with known employee demand, including breaks, overtime, and employee preferences

Thumbnail
View/Open
3126-12176-1-PB.pdf (372,4Kb)
  View Usage Statistics
  LA Referencia / Recolecta stats
Cita com:
hdl:2117/339480

Show full item record
Soriano, Jhunievieve
Jalao, Eugene Rex
Martinez, Iris Ann
Document typeArticle
Defense date2020-12
PublisherOmniaScience
Rights accessOpen Access
Attribution-NonCommercial 4.0 International
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial 4.0 International
Abstract
Purpose: This research paper introduces an integrated employee scheduling problem that considersvarious real-life problems such as varying employee demand, different employee working conditions, andindividual preferences, regarding schedules. Design/methodology/approach: The proposed model, which is a combination of Analytic HierarchyProcess and Mixed Integer Linear Programming, is used to solve the problem with multi-dimensionalobjectives period.Findings: Results show that the proposed model generates optimal and feasible solutions for weeklyemployee schedules.Originality/value: Many employee scheduling problems in literature are able to solve the employeescheduling problem to a large extent. However, these studies still do not fully reflect current realisticorganizational problems such as varying employee demand per hour interval, different employee workingconditions on disjoint shifts and breaks, and individual preferences regarding schedules all at the sametime
CitationSoriano, J.; Jalao, E.R.; Martinez, I.A. Integrated employee scheduling with known employee demand, including breaks, overtime, and employee preferences. "Journal of Industrial Engineering and Management", Desembre 2020, vol. 13, núm. 3, p. 451-463. 
URIhttp://hdl.handle.net/2117/339480
DLB-28744-2008
ISSN2013-0953
Collections
  • JIEM: Journal of Industrial Engineering and Management - 2020, vol. 13, núm. 3 [9]
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
3126-12176-1-PB.pdf372,4KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina