Mostra el registre d'ítem simple

dc.contributor.authorBautista Valhondo, Joaquín
dc.contributor.authorAlfaro Pozo, Rocío
dc.contributor.authorBatalla García, Cristina
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.date.accessioned2015-07-09T07:31:32Z
dc.date.available2015-07-09T07:31:32Z
dc.date.created2015
dc.date.issued2015
dc.identifier.citationBautista, J.; Alfaro, R.; Batalla, C. Productivity improvement, considering legal conditions and Just In Time principles in the mixed-model Sequencing problem. A: International Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference. "Engineering Systems and Networks: the way ahead for industrial engineering and operations management". Aveiro: 2015, p. 1-8.
dc.identifier.urihttp://hdl.handle.net/2117/28550
dc.description.abstractA new mathematical model to solve the Mixed-Model Sequencing Problem with Work overload minimization is formulated. The model incorporates productive, social and legal aspects in order to move the theory problem closer to the actual industrial environments. Specifically, there are considered the variation of work pace of workers throughout the workday to increase the completed work; the conditions of occupancy level of workers imposed by the collective agreements; and the idea of keeping constant the production mix through the sequence leading both to a balance between the required workloads at stations and regular consumption of components. Indeed, by means of a case study linked to Nissan, a gain of over 98% is achieved in terms of regular cumulative production and required work, while performing the 100% of required work and following legal restrictions of operators’ saturation.
dc.format.extent8 p.
dc.language.isoeng
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshJust-in-time series
dc.subject.otherMixed-model
dc.subject.othersequencing
dc.subject.otherjust-in-time
dc.subject.otherwork pace
dc.subject.othersaturation
dc.titleProductivity improvement, considering legal conditions and Just In Time principles in the mixed-model Sequencing problem
dc.typeConference report
dc.subject.lemacTreball -- Productivitat
dc.subject.lemacProducció -- Organització
dc.subject.lemacJust a temps (Sistema)
dc.contributor.groupUniversitat Politècnica de Catalunya. OPE - Organització de la Producció i d'Empresa (aspectes tècnics, jurídics i econòmics en Producció)
dc.relation.publisherversionhttp://www.icieom.org/
dc.rights.accessOpen Access
local.identifier.drac16656285
dc.description.versionPostprint (published version)
local.citation.authorBautista, J.; Alfaro, R.; Batalla, C.
local.citation.contributorInternational Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference
local.citation.pubplaceAveiro
local.citation.publicationNameEngineering Systems and Networks: the way ahead for industrial engineering and operations management
local.citation.startingPage1
local.citation.endingPage8


Fitxers d'aquest items

Thumbnail

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple