RAMI strategies in the IFMIF Test Facilities design
View/Open
RAMI.pdf (932,4Kb) (Restricted access)
Request copy
Què és aquest botó?
Aquest botó permet demanar una còpia d'un document restringit a l'autor. Es mostra quan:
- Disposem del correu electrònic de l'autor
- El document té una mida inferior a 20 Mb
- Es tracta d'un document d'accés restringit per decisió de l'autor o d'un document d'accés restringit per política de l'editorial
Cita com:
hdl:2117/21226
Document typeArticle
Defense date2013-10-01
Rights accessRestricted access - publisher's policy
This work is protected by the corresponding intellectual and industrial property rights.
Except where otherwise noted, its contents are licensed under a Creative Commons license
:
Attribution-NonCommercial-NoDerivs 3.0 Spain
Abstract
In this paper, a RAMI analysis of the different stages in Test Facilities (TF) design is described. The comparison between the availability results has been a milestone not only to evaluate the major unavailability contributors in the updates but also to implement fault tolerant design strategies when possible. These strategies encompass a wide range of design activities: from the definition of degraded modes of operation in the Test Facilities to specific modifications in the test modules in order to guarantee their fail safe operation.
CitationAbal, J. [et al.]. RAMI strategies in the IFMIF Test Facilities design. "Fusion engineering and design", 01 Octubre 2013, vol. 88, núm. 9-10, p. 2535-2538.
ISSN0920-3796
Files | Description | Size | Format | View |
---|---|---|---|---|
RAMI.pdf![]() | 932,4Kb | Restricted access |