Show simple item record

dc.contributor.authorCompanys Pascual, Ramón
dc.contributor.authorRibas Vila, Immaculada
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.date.accessioned2013-09-30T11:55:42Z
dc.date.available2013-09-30T11:55:42Z
dc.date.created2013
dc.date.issued2013
dc.identifier.citationCompanys, R.; Ribas, I. A new constructive heuristic for the Fm|block|¿T. A: International Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización. "Industrial Engineering and Complexity Management. Book of Abstracts". Valladolid: 2013, p. 500-507.
dc.identifier.isbn978-84-616-5340-9
dc.identifier.urihttp://hdl.handle.net/2117/20237
dc.description.abstractThis paper deals with the blocking flow shop problem and proposes new constructive procedure s for the total tardiness minimization of jobs. The heuristic has three - phases to build the sequence; the first phase selects the first job to be scheduled, the second phase ar ranges the remaining jobs and the third phase uses the insertion procedure of NEH to improve the sequence. T he proposed proce- dures evaluate the tardiness associated to the sequence obtained before and after the third phase in order to keep the best of both because , we have observed , that the insertion phase can worsen the result . The c omputational evaluation of these procedures against the benchmark constructive procedures from the literature re- veals their good performance
dc.format.extent8 p.
dc.language.isoeng
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject.lcshHeuristic algorithms
dc.titleA new constructive heuristic for the Fm|block|¿T
dc.typeConference report
dc.subject.lemacHeurística
dc.contributor.groupUniversitat Politècnica de Catalunya. EOLI - Enginyeria d'Organització i Logística Industrial
dc.rights.accessOpen Access
local.identifier.drac12773850
dc.description.versionPostprint (published version)
local.citation.authorCompanys, R.; Ribas, I.
local.citation.contributorInternational Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización
local.citation.pubplaceValladolid
local.citation.publicationNameIndustrial Engineering and Complexity Management. Book of Abstracts
local.citation.startingPage500
local.citation.endingPage507


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial-NoDerivs 3.0 Spain