dc.contributor.author | Tarrago, Dani |
dc.contributor.author | Deu, Amadeu |
dc.contributor.author | Gens Solé, Antonio |
dc.contributor.author | Alonso Pérez de Agreda, Eduardo |
dc.contributor.author | Griell, R. |
dc.contributor.other | Universitat Politècnica de Catalunya. Departament d'Enginyeria del Terreny, Cartogràfica i Geofísica |
dc.date.accessioned | 2013-03-14T16:07:37Z |
dc.date.created | 2012 |
dc.date.issued | 2012 |
dc.identifier.citation | Tarrago, D. [et al.]. Preload improvement and monitoring in a newly reclaimed area. A: International Conference on Ground Improvement and Ground Control. "International Conference on Ground Improvement and Ground Control: transport infraestructure development and natural hazards mitigation, ICGI 2012: Wollongong, Australia: 30 October-2 November, 2012: proceedings". Wollongong: Research Publishing, 2012, p. 389-394. |
dc.identifier.isbn | 978-981-07-3577-7 |
dc.identifier.uri | http://hdl.handle.net/2117/18310 |
dc.description.abstract | The paper describes the preload improvement of a newly reclaimed area that is part of the current development of the Barcelona Port. The area will provide the required surface of a new container terminal with a berth length of 1,600 m. The total surface area is 750,000 m2. The improvement affects both the hydraulic fill placed for the reclamation as well as the underlying soft natural ground. Improvement was required for both reducing subsequent settlements and providing an adequate level of stability during construction and quay commissioning. Special attention has been given to the reduction of the liquefaction potential of the hydraulic fill. The degree of improvement has been assessed comparing extensive site investigations performed before and after preloading. CPTu tests have
proved especially useful in this regard. An extensive instrumentation scheme was deployed to observe the progress of preloading throughout the whole process. In
some areas, preloading was supplemented by the installation of prefabricated vertical drains and by reinforcement using large-diameter gravel columns. The paper describes the ground improvement operations and the field monitoring observations performed during the works. |
dc.format.extent | 6 p. |
dc.language.iso | eng |
dc.publisher | Research Publishing |
dc.subject | Àrees temàtiques de la UPC::Enginyeria civil::Geotècnia::Mecànica de sòls |
dc.subject.lcsh | Soil stabilization |
dc.title | Preload improvement and monitoring in a newly reclaimed area |
dc.type | Conference report |
dc.subject.lemac | Sòls -- Estabilització |
dc.contributor.group | Universitat Politècnica de Catalunya. MSR - Mecànica del Sòls i de les Roques |
dc.rights.access | Restricted access - publisher's policy |
local.identifier.drac | 11632813 |
dc.description.version | Postprint (published version) |
dc.date.lift | 10000-01-01 |
local.citation.author | Tarrago, D.; Deu, A.; Gens, A.; Alonso, E.; Griell, R. |
local.citation.contributor | International Conference on Ground Improvement and Ground Control |
local.citation.pubplace | Wollongong |
local.citation.publicationName | International Conference on Ground Improvement and Ground Control: transport infraestructure development and natural hazards mitigation, ICGI 2012: Wollongong, Australia: 30 October-2 November, 2012: proceedings |
local.citation.startingPage | 389 |
local.citation.endingPage | 394 |