Sustainable Drainage Systems (SuDS) at Helsingborg. Assessment and optimization
Visualitza/Obre
corrected-final-draft-report-nestor-bernard.pdf (4,792Mb) (Accés restringit)
Estadístiques de LA Referencia / Recolecta
Inclou dades d'ús des de 2022
Cita com:
hdl:2117/173510
Realitzat a/ambLunds universitet
Tipus de documentProjecte Final de Màster Oficial
Data2019-10-28
Condicions d'accésAccés restringit per decisió de l'autor
Tots els drets reservats. Aquesta obra està protegida pels drets de propietat intel·lectual i
industrial corresponents. Sense perjudici de les exempcions legals existents, queda prohibida la seva
reproducció, distribució, comunicació pública o transformació sense l'autorització del titular dels drets
Abstract
Increase of urbanization and climate change are one of the factors that have been highlighted to influence hydrography. This is resulting in an increase in peak flow within an urban watershed. Downstream floodingand increased pollution arethe problemsthat arises. To solve this, the sustainable urban drainage system techniques are adopted for reducing peak flow and increase baseflow. This thesis studies the assessment and optimisation of multipurposeconstructed structures usedin drainage systems in the Lussebäcken catchment in Helsingborg to reduce the possibilities of flooding while serving an environmental task.The water is transported from an upstream high plain catchmentwith a good fall height through Ramlösaravineand discharges in the Råå Brook near the sea. Downstream within the low-lying area are residential buildings, industries and roads that are sensitiveto flooding.Using the computer software MIKE URBAN with MOUSE engine, rainfall runoff was simulated and flow in the network system was computed. Three scenarios have been simulated; before 2008, when no additional ponds were added, the current situation with new constructed ponds and wetlands added to the model and a proposed modification to improve the regulation of the already existing infrastructures.The results show an improvement of over 20% of reduction of the peak flow in the mainstreamaround the most critical areafor the current situation over the 2008 situation and 8% more of improvement is obtained by regulating the output of one of the ponds.From the obtained results the main improvement could bemadewhen storing capacity to the network rahter than regulatingthe existing ponds
MatèriesDrainage, Hydraulic structures, Drenatge, Inundacions -- Danys -- Prevenció, Estructures hidràuliques
TitulacióMÀSTER UNIVERSITARI EN ENGINYERIA INDUSTRIAL (Pla 2014)
Col·leccions
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
corrected-final-draft-report-nestor-bernard.pdf | 4,792Mb | Accés restringit |