Modelling the construction of cable stayed bridges stressed with the strand by strand technique
Visualitza/Obre
24029119.pdf (2,224Mb) (Accés restringit)
Sol·licita una còpia a l'autor
Què és aquest botó?
Aquest botó permet demanar una còpia d'un document restringit a l'autor. Es mostra quan:
- Disposem del correu electrònic de l'autor
- El document té una mida inferior a 20 Mb
- Es tracta d'un document d'accés restringit per decisió de l'autor o d'un document d'accés restringit per política de l'editorial
Estadístiques de LA Referencia / Recolecta
Inclou dades d'ús des de 2022
Cita com:
hdl:2117/132458
Tipus de documentText en actes de congrés
Data publicació2019
EditorInternational Association for Bridge and Structural Engineers (IABSE)
Condicions d'accésAccés restringit per política de l'editorial
Tots els drets reservats. Aquesta obra està protegida pels drets de propietat intel·lectual i
industrial corresponents. Sense perjudici de les exempcions legals existents, queda prohibida la seva
reproducció, distribució, comunicació pública o transformació sense l'autorització del titular dels drets
ProjecteSISTEMA DE APOYO A LA TOMA DE DECISIONES DURANTE EL CICLO DE VIDA DE LAS INFRAESTRUCTURAS: SMART-INFRASTRUCTURES (MINECO-BIA2013-47290-R)
MODELOS ESTRUCTURALES PARA LA GESTION EFICIENTE DE INFRAESTRUCTURAS: SMART BIM MODELS (AEI-BIA2017-86811-C2-1-R)
MODELOS ESTRUCTURALES PARA LA GESTION EFICIENTE DE INFRAESTRUCTURAS: SMART BIM MODELS (AEI-BIA2017-86811-C2-1-R)
Abstract
The temporary supports erection method is the most common way of building cable-stayed bridges. In this technique the bridge deck is first built over a set of temporary and permanent supports. Then, during the tensioning process, the stays are successively placed and tensioned by the jacks and the deck is raised from the temporary supports. Several variants of this method are the launching of the bridge and the rotation method. This paper proposes an algorithm to calculate and to control the construction of such bridges when the strand by strand tensioning technique is used. It is based on the unstressed length of the stays concept. The use of such concept enables a fast and direct simulation of construction stages by analysing independent Finite Element Models. As there is no need of superposition of models it is a very convenient way for construction supervision.
CitacióLozano-Galant, J.A.; Turmo, J. Modelling the construction of cable stayed bridges stressed with the strand by strand technique. A: International Association for Bridge and Structural Engineering Symposium. "IABSE Symposium Guimarães 2019: Towards a Resilient Built Environment - Risk and Asset Management, March 27-29, 2019, Guimarães, Portugal". International Association for Bridge and Structural Engineers (IABSE), 2019, p. 1058-1064.
ISBN978-3-85748-163-5
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
24029119.pdf | 2,224Mb | Accés restringit |