Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
59.593 UPC E-Prints
You are here:
View Item 
  •   DSpace Home
  • E-prints
  • Departaments
  • Departament d'Enginyeria Civil i Ambiental
  • Articles de revista
  • View Item
  •   DSpace Home
  • E-prints
  • Departaments
  • Departament d'Enginyeria Civil i Ambiental
  • Articles de revista
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Case study of failure of long prestressed precast concrete girder during lifting

Thumbnail
View/Open
23966543.pdf (495,6Kb)
Share:
 
 
10.1016/j.engfailanal.2019.02.061
 
  View Usage Statistics
Cita com:
hdl:2117/130849

Show full item record
Fuente Antequera, Albert de laMés informacióMés informacióMés informació
Bairán García, Jesús MiguelMés informacióMés informacióMés informació
Pialarissi Cavalaro, Sergio HenriqueMés informació
Document typeArticle
Defense date2019-06
PublisherElsevier
Rights accessOpen Access
Attribution-NonCommercial-NoDerivs 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial-NoDerivs 3.0 Spain
Abstract
Improvements in concrete technology, reinforcing systems and manufacturing enable the use of longer reinforced precast concrete girders, contributing to the competitiveness of this solution for bridge decks. The weight of the girders should be limited in order to achieve an optimum between span length, transportation costs and lifting costs. The current tendency in design is to minimize the width of the flanges of the girder. This makes the element more flexible to lateral deformation and increases the risk of lateral instability in temporary situations without lateral supports. This is reflected in an increment of the number of accidents and damages associated with such phenomenon. The main objective of this study is to describe a real case study of lateral instability of a 46¿m long prestressed concrete girder during lifting operations as well as to perform a parametric study to understand the limits of the problem observed. In addition to presenting the case study, simplified formulations and numerical simulations are used to assess the safety margins against lateral instability. Special attention is paid to the evaluation of the provisions gathered in codes and guidelines regarding the lateral stability since they might not cover extreme cases.
Citationde la Fuente, A.; Bairan, J.M.; Pialarissi, S. Case study of failure of long prestressed precast concrete girder during lifting. "Engineering failure analysis", Juny 2019, vol. 100, p. 512-519. 
URIhttp://hdl.handle.net/2117/130849
DOI10.1016/j.engfailanal.2019.02.061
ISSN1350-6307
Publisher versionhttps://www.sciencedirect.com/science/article/abs/pii/S1350630717302236
Other identifiershttps://www.researchgate.net/publication/331416380_Case_study_of_failure_of_long_prestressed_precast_concrete_girder_during_lifting
Collections
  • Departament d'Enginyeria Civil i Ambiental - Articles de revista [2.657]
  • ATEM - Anàlisi i Tecnologia d'Estructures i Materials - Articles de revista [298]
  • EC - Enginyeria de la Construcció - Articles de revista [299]
Share:
 
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
23966543.pdf495,6KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina