Mostra el registre d'ítem simple

dc.contributor.authorElkherbawy, Ahmed
dc.contributor.authorLozano Galant, José Antonio
dc.contributor.authorRamos Schneider, Gonzalo
dc.contributor.authorTurmo Coderque, José
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Enginyeria Civil i Ambiental
dc.date.accessioned2018-10-03T13:41:52Z
dc.date.issued2018
dc.identifier.citationElkherbawy, A., Lozano-Galant, J.A., Ramos, G., Turmo, J. Comparison of project management and lean construction in a real road project. A: International Scientific Conference on Civil Engineering: Present Problems, Innovative Solutions. "CEPPIS'2018: Civil Engineering: Present Problems, Innovative Solutions". 2018, p. 167-197.
dc.identifier.isbn978-83-87480-06-6
dc.identifier.urihttp://hdl.handle.net/2117/121859
dc.description.abstractProject Management, PM, refers to the practice of planning, executing and controlling certain tasks to achieve specific goals at the specified time. Applications of this methodology (such as the Gantt chart) are commonly used in construction road projects. In order to increase productivity and reduce project costs, alternative management approaches (such as the Lean Construction, LC) can be followed. In this approach, the lean manufacturing principles are applied to achieve a delivering value with less waste (or in other words, with lower construction time). The aim of this study is to compare the traditional PM and the LC for the construction process of an actual road built in Cairo (Egypt) between the cities of Cairo and Alexandria. In this study, the analysis of certain parameters (such as the percent plan complete, root cause of delays or the total project duration) will be analysed for different construction scenarios. The results of the paper illustrate the advantages of using LC over the traditional PM approach in road projects.
dc.format.extent31 p.
dc.language.isoeng
dc.subjectÀrees temàtiques de la UPC::Enginyeria civil::Infraestructures i modelització dels transports::Transport per carretera
dc.subject.lcshRoads--Design and construction
dc.subject.otherLean Construction
dc.subject.otherRoad project
dc.subject.otherLast Planner System
dc.subject.otherPercent Plan Complete
dc.subject.otherRoot Cause of Delay
dc.subject.otherTotal project duration
dc.titleComparison of project management and lean construction in a real road project
dc.typeConference report
dc.subject.lemacCarreteres -- Disseny i construcció
dc.contributor.groupUniversitat Politècnica de Catalunya. EC - Enginyeria de la Construcció
dc.description.peerreviewedPeer Reviewed
dc.rights.accessRestricted access - publisher's policy
local.identifier.drac23385565
dc.description.versionPostprint (published version)
dc.date.lift10000-01-01
local.citation.authorElkherbawy, A.; Lozano-Galant, J.A.; Ramos, G.; Turmo, J.
local.citation.contributorInternational Scientific Conference on Civil Engineering: Present Problems, Innovative Solutions
local.citation.publicationNameCEPPIS'2018: Civil Engineering: Present Problems, Innovative Solutions
local.citation.startingPage167
local.citation.endingPage197


Fitxers d'aquest items

Imatge en miniatura

Aquest ítem apareix a les col·leccions següents

Mostra el registre d'ítem simple