dc.identifier.citationOrtiz Pimiento, N. R.; Diaz-Serna, F. J. The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review. "Journal of Industrial Engineering and Management", Març 2018, vol. 11, núm. 1, p. 116-134.
dc.identifier.issn2013-0953
dc.identifier.urihttp://hdl.handle.net/2117/117305
dc.description.abstractPurpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.
dc.format.extent19 p.
dc.language.isoeng
dc.publisherOmniaScience
dc.rightsAttribution-NonCommercial 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions::Direcció de projectes
dc.subject.lcshProject management--Planning
dc.subject.otherProject scheduling
dc.subject.otherRandom duration
dc.subject.otherUncertain duration
dc.subject.otherStochastic duration
dc.subject.otherTask duration
dc.titleThe Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
dc.typeArticle
dc.subject.lemacGestió de projectes -- Planificació
dc.identifier.doi10.3926/jiem.2492
dc.identifier.dlB-28744-2008
dc.description.peerreviewedPeer Reviewed
dc.rights.accessOpen Access
local.citation.publicationNameJournal of Industrial Engineering and Management
local.citation.volume11
local.citation.number1
local.citation.startingPage116
local.citation.endingPage134


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial 3.0 Spain