Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
13.660 Articles in journals published by the UPC
You are here:
View Item 
  •   DSpace Home
  • Revistes
  • JIEM: Journal of Industrial Engineering and Management
  • 2018, vol. 11, núm. 1
  • View Item
  •   DSpace Home
  • Revistes
  • JIEM: Journal of Industrial Engineering and Management
  • 2018, vol. 11, núm. 1
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

Thumbnail
View/Open
2492-10320-1-PB.pdf (374,4Kb)
 
10.3926/jiem.2492
 
  View Usage Statistics
  LA Referencia / Recolecta stats
Cita com:
hdl:2117/117305

Show full item record
Ortiz Pimiento, Nestor Raul
Diaz-Serna, F. Javier
Document typeArticle
Defense date2018-03
PublisherOmniaScience
Rights accessOpen Access
Attribution-NonCommercial 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial 3.0 Spain
Abstract
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.
CitationOrtiz Pimiento, N. R.; Diaz-Serna, F. J. The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review. "Journal of Industrial Engineering and Management", Març 2018, vol. 11, núm. 1, p. 116-134. 
URIhttp://hdl.handle.net/2117/117305
DOI10.3926/jiem.2492
DLB-28744-2008
ISSN2013-0953
Collections
  • JIEM: Journal of Industrial Engineering and Management - 2018, vol. 11, núm. 1 [8]
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
2492-10320-1-PB.pdf374,4KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina