Ir al contenido (pulsa Retorno)

Universitat Politècnica de Catalunya

    • Català
    • Castellano
    • English
    • LoginRegisterLog in (no UPC users)
  • mailContact Us
  • world English 
    • Català
    • Castellano
    • English
  • userLogin   
      LoginRegisterLog in (no UPC users)

UPCommons. Global access to UPC knowledge

Banner header
59.760 UPC E-Prints
You are here:
View Item 
  •   DSpace Home
  • E-prints
  • Grups de recerca
  • EOLI - Enginyeria d'Organització i Logística Industrial
  • Articles de revista
  • View Item
  •   DSpace Home
  • E-prints
  • Grups de recerca
  • EOLI - Enginyeria d'Organització i Logística Industrial
  • Articles de revista
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Embodying decisions on work shifts into strategic manufacturing capacity planning

Thumbnail
View/Open
SCP_Model Torns_IJPR_prepub.pdf (250,2Kb)
Share:
 
 
10.1080/00207543.2017.1421325
 
  View Usage Statistics
Cita com:
hdl:2117/113131

Show full item record
Benedito Benet, ErnestMés informacióMés informació
Corominas Subias, AlbertMés informacióMés informació
Document typeArticle
Defense date2018-01-03
PublisherTaylor & Francis
Rights accessOpen Access
Attribution-NonCommercial-NoDerivs 3.0 Spain
Except where otherwise noted, content on this work is licensed under a Creative Commons license : Attribution-NonCommercial-NoDerivs 3.0 Spain
Abstract
© 2018 Informa UK Limited, trading as Taylor & Francis Group In spite of the obvious impact that decisions on workforce planning have on the capacity of a production system, they are rarely mentioned in strategic capacity planning literature. This paper analyses the implications of embodying decisions on work shifts in strategic capacity planning and proposes a mathematical programming model that allows treating any type of relationship between the intensity in the use of the production equipment and maintenance and variable production costs. A computational experiment shows that the model can be solved in acceptable computing times for moderate values of the number of types of equipment and of work shifts. Using the model, the optimal solutions for diverse scenarios are presented and compared with those obtained under the assumption that the work shifts must be kept invariable over the entire horizon.
CitationBenedito, E., Corominas, A. Embodying decisions on work shifts into strategic manufacturing capacity planning. "International journal of production research", 3 Gener 2018, p. 1-12. 
URIhttp://hdl.handle.net/2117/113131
DOI10.1080/00207543.2017.1421325
ISSN0020-7543
Publisher versionhttp://www.tandfonline.com/doi/abs/10.1080/00207543.2017.1421325?journalCode=tprs20
Collections
  • EOLI - Enginyeria d'Organització i Logística Industrial - Articles de revista [126]
  • Departament d'Organització d'Empreses - Articles de revista [777]
Share:
 
  View Usage Statistics

Show full item record

FilesDescriptionSizeFormatView
SCP_Model Torns_IJPR_prepub.pdf250,2KbPDFView/Open

Browse

This CollectionBy Issue DateAuthorsOther contributionsTitlesSubjectsThis repositoryCommunities & CollectionsBy Issue DateAuthorsOther contributionsTitlesSubjects

© UPC Obrir en finestra nova . Servei de Biblioteques, Publicacions i Arxius

info.biblioteques@upc.edu

  • About This Repository
  • Contact Us
  • Send Feedback
  • Privacy Settings
  • Inici de la pàgina