Mostra el registre d'ítem simple
Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction
dc.contributor.author | Vidal-Carreras, Pilar I. |
dc.contributor.author | García Sabater, José Pedro |
dc.date.accessioned | 2010-01-08T10:35:07Z |
dc.date.available | 2010-01-08T10:35:07Z |
dc.date.issued | 2009-12 |
dc.identifier.citation | Vidal-Carreras,, Pilar I.; García Sabater, José Pedro. Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction. "Journal of Industrial Engineering and Management", 2009, vol. 2, núm. 3, p. 437-463. |
dc.identifier.issn | 2013-0953 |
dc.identifier.uri | http://hdl.handle.net/2099/8484 |
dc.description.abstract | We built on the Economic Lot Scheduling Problem Scheduling (ELSP) literature by making some modifications in order to introduce new constraints which had not been thoroughly studied with a view to simulating specific real situations. Specifically, our aim is to propose and simulate different scheduling policies for a new ELSP variant: Deliberated Coproduction. This problem comprises a product system in an ELSP environment in which we may choose if more than one product can be produced on the machine at a given time. We expressly consider the option of coproducing two products whose demand is not substitutable. In order to draw conclusions, a simulation model and its results were developed in the article by employing modified Bomberger data which include two items that could be produced simultaneously |
dc.format.extent | 27 p. |
dc.language.iso | eng |
dc.publisher | School of Industrial and Aeronautic Engineering of Terrassa (ETSEIAT). Universitat Politècnica de Catalunya (UPC) |
dc.rights | Attribution-NonCommercial 3.0 Spain |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/3.0/es/ |
dc.subject | Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions |
dc.subject.lcsh | Production control |
dc.subject.other | ELSP |
dc.subject.other | Economic Lot Scheduling Problem |
dc.subject.other | Simulation |
dc.subject.other | Heuristics |
dc.subject.other | Coproduction |
dc.title | Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction |
dc.type | Article |
dc.subject.lemac | Producció -- Control -- Automatització |
dc.identifier.dl | B-28744-2008 |
dc.description.peerreviewed | Peer Reviewed |
dc.rights.access | Open Access |
local.citation.author | Vidal-Carreras,, Pilar I.; García Sabater, José Pedro |
local.citation.publicationName | Journal of Industrial Engineering and Management |
local.citation.volume | 2 |
local.citation.number | 3 |
local.citation.startingPage | 437 |
local.citation.endingPage | 463 |