Mostra el registre d'ítem simple
Improved logistics of an assembly line
dc.contributor | Portioli Staudacher, Alberto |
dc.contributor.author | Putin Burgos, Carlos |
dc.date.accessioned | 2013-01-24T20:27:29Z |
dc.date.issued | 2011 |
dc.identifier.uri | http://hdl.handle.net/2099.1/16877 |
dc.description.abstract | This project has been developed in the plant of Mangeti Marelli SPA. in Corbetta (Milano). It is based on the improvement of a final assembly line from the logistic point of view. In order to reduce the stock volume in the plant and to obtain a blanced production with the custumers Takt.time synchronyzing the income material with the outcome final product. It is divided in three parts:-Magnet Marelli Spa. description. -World Class Mnufacturing system description and Lean Manufacturing concepts. - Project development |
dc.language.iso | eng |
dc.publisher | Universitat Politècnica de Catalunya |
dc.publisher | Politecnico di Milano |
dc.subject | Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions::Anàlisi de processos de negoci i de fabricació |
dc.subject.lcsh | Assembly-line methods -- Planning |
dc.subject.lcsh | Industrial efficiency |
dc.subject.lcsh | Production management |
dc.title | Improved logistics of an assembly line |
dc.type | Master thesis (pre-Bologna period) |
dc.subject.lemac | Treball en cadena -- Planificació |
dc.subject.lemac | Eficiència industrial |
dc.subject.lemac | Producció -- Direcció i administració |
dc.rights.access | Restricted access - author's decision |
dc.date.lift | 10000-01-01 |
dc.audience.educationlevel | Estudis de primer/segon cicle |
dc.audience.mediator | Escola Tècnica Superior d'Enginyeria Industrial de Barcelona |
dc.audience.degree | ENGINYERIA INDUSTRIAL (Pla 1994) |
dc.description.mobility | Outgoing |