The EPS is a one-semester course designed to train third-year engineering students to work in international teams. In an EPS, an international team of students works on a real-life project that has been proposed by a company. The language of communication is English. Students are awarded 30 ECTS credits if they succesfully complete the programme. A certificate is also issued.

Enviaments recents

  • Technologies for events 

    Vermeulen, Stein; Górski, Michal; Albarral, Jordi; Moseñe, Toni; Tezanos, Isabel (Universitat Politècnica de Catalunya, 2012-06)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Artesis Hogeschool Antwerpen
  • Diamond coating for biomedical engineering 

    Brito, Fabio; Derian, Alexandre; Nabih, Soufiane; Amores Cárdenas, Fernando (Universitat Politècnica de Catalunya, 2012-06)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Politechnika Łódzka. Centrum Kształcenia Międzynarodowego
    This report describes an investigation by a student team in the framework of European Project Semester, into the use of diamond carbon coatings for biomedical engineering. Allotropic forms of carbon applications are being ...
  • Algorithms for swarm robotics on mobile robotic station : pushing and connecting 

    Cárdenas Álvarez, Pedro Pablo (Universitat Politècnica de Catalunya, 2012)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Nottingham Trent University
    Swarm robots are constrained in their long-term due to a limited power supply. Normally, rechargeable batteries are utilized that may only provide a few hours. A mobile charging station is required. Also, algorithms are ...
  • Heating and ventilating system for IFE building : With the use of renewable energy sources. 

    Pouliquen, Ludovic; Auñón Plandolit, Elena; Papierski, Artur; Mesas Aperador, David (Universitat Politècnica de Catalunya, 2011)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Politechnika Lódzka
    For the last fifteen weeks our team, consisting of four members, has been carrying out the project entitled “Heating and ventilating system for IFE building, with the use of renewable energy sources” for the European Project ...
  • Sustainable Energy Solution for Off Grid Energy Supply in the Kvarken Archipelago near Vasa, Finland 

    Ala Puig, Oriol; Eebes, Tim; Hopchet, Christophe; Lahmaidi, Rida; Liang, Hui; Lillqvist, Simon (Universitat Politècnica de Catalunya, 2012-05)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Yrkeshögskolan Novia
    Today it is often diesel generators which provide the energy supply for remote islands in the archipelago. This project is about the development of a model for evaluation of energy needs but also to find a concept for ...
  • Safety carabiner to protect customers 

    Cheung, Margot; Dominguez, Miriam; Kilic, Hasan; Schilling, Julian (Universitat Politècnica de Catalunya, 2012-06)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Fachhochschule Kiel / Hochseilgarten Altenhof
    (1) Objectives Due to the frequent faulty being found and the increasing price of the current safety system, the High Ropes Course Altenhof has been starting to invent its very own carabiner, ―Clip – Monkey‖. The Bornack ...
  • Mobile PIR detection system 

    Ceballo Iñigo, Amanda; Lindhardt, Mark; Pelin, Mathieu; Loeches Sánchez, Raúl (Universitat Politècnica de Catalunya, 2012-06)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Copenhagen University College of Engineering
    Imagine a soldier on a mission in Afghanistan. During the evening, his Platoon has to set up a base camp to protect themselves against enemies and to get some rest. Normally, a Platoon setting up a camp has to position at ...
  • Green technology 

    Burroughs, Emily; Cooreman, Hermine; Cuella, Andrea; Rodriguez, Victor (Universitat Politècnica de Catalunya, 2012-09)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Ingeniørhøjskolen i København
  • Improve and install the Foucault Pendulum in the entrance hall 

    Bongert, Kai; Kohlmeier, Kai; Chen, Zhen Wen He; Carrasco, Francesc (Universitat Politècnica de Catalunya, 2011-11)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Høgskolen i Oslo
    The objective of this report is the continuation of the EPS Fall 2010 Project “Build A Foucault Pendulum In The Entrance Hall”. Main contents of the first part are the improvements in the suspension and the driving system. ...
  • RUF power pick-up 

    Máté, Ádám; Overeijnder, Hein; Galián, Laura; Griffiths-Jones, Mark (Universitat Politècnica de Catalunya, 2011-12)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  RUF International / Ingeniørhøjskolen i København
    At the following pages you can find the development of the project “RUF Power Pick up”. The RUF System is a dual mode system that can be propelled by its own batteries and from the monorail. This system is a traffic ...
  • Material data of laminates made of glass filaments and thermoplastics 

    Ponce Pascual, Carles (Universitat Politècnica de Catalunya, 2011-12)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Hochschule Darmstadt
    Many composites used today are at the leading edge of materials technology, with performance and costs appropriate to ultra demanding applications such as spacecraft. But heterogeneous materials combining the best aspects ...
  • Closing system 

    Grünefeld, Andre; García González, Adrián; Knapen, Simon; Smetsers, Raymond (Universitat Politècnica de Catalunya, 2011-12)
    Treball Final de Grau
    Accés restringit per decisió de l'autor
    Realitzat a/amb:  Ingeniørhøjskolen i København / RUF International
    The following report is based on the project made by EPS students of group 7 in the autumn 2011. The faced decisions and problems are derived from the Mini-RUF project. The Mini RUF is a concept vehicle of new public ...

Mostra'n més