Mounting of the electro-mechanical elements of Flamanville Power Plant Support
View/Open
Report (3,188Mb) (Restricted access)
Tutor / directorAlbert, Olivier
Document typeMaster thesis (pre-Bologna period)
Date2010
Rights accessRestricted access - author's decision
All rights reserved. This work is protected by the corresponding intellectual and industrial
property rights. Without prejudice to any existing legal exemptions, reproduction, distribution, public
communication or transformation of this work are prohibited without permission of the copyright holder
Abstract
In this multidisciplinary internship at Sofinel, an EDF and AREVA subsidiary created for the construction of the EPRs around the world, I performed multiple tasks.
Working on the mechanical equipment group I learned how a magnificent project like the construction of a nuclear power plant is managed. A strong, rigorous and standardized engineering change management has to be implemented in order to maintain the safety level and the technical and cost consistency of the project.
In fact, a contract is constantly changing because of the evolving specifications for the equipments and the modifications caused by other elements. Therefore multiple procedures and the associated sheets have to be created to manage this constant change.
In this report we will find described the organization of the Flamanville’s EPR project as well as a description of the engineering change management implemented. Examples of those procedures and sheets will also be presented in order to better understand the project organization and the work of a project engineer.
SubjectsNuclear power plants -- Security measures, Nuclear power plants--Economic aspects, centrals nuclears -- Mesures de seguretat, Centrals nuclears – Optimització