Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement

Carregant...
Miniatura
El pots comprar en digital a:
El pots comprar en paper a:

Projectes de recerca

Unitats organitzatives

Número de la revista

Títol de la revista

ISSN de la revista

Títol del volum

Col·laborador

Editor

Tribunal avaluador

Realitzat a/amb

Tipus de document

Article

Data publicació

Editor

Condicions d'accés

Accés obert

Llicència

Creative Commons
Aquesta obra està protegida pels drets de propietat intel·lectual i industrial corresponents. Llevat que s'hi indiqui el contrari, els seus continguts estan subjectes a la llicència de Creative Commons: Reconeixement-NoComercial-SenseObraDerivada 3.0 Espanya

Assignatures relacionades

Assignatures relacionades

Publicacions relacionades

Datasets relacionats

Datasets relacionats

Projecte CCD

Abstract

Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come from collective agreements and therefore must be respected by both company and labor unions. The first model takes into account the saturation limit of the workstations, and the second model also includes the activation of the operators throughout the working day. Two computational experiments were carried out using a case study of the Nissan motor plant in Barcelona with two main objectives: (1) to study the repercussions of the saturation limit on the decrease in productivity on the line and (2) to evaluate the recovery of productivity on the line via both activation of operators, while maintaining the same quality in working conditions achieved by limiting the saturation, and auxiliary processors. By results we state that saturation limitation leads an important increase of work overload, which means average economic losses of 28,731.8 Euros/day. However, the productivity reduction may be counteracted by the work pace factor increase, at certain moments of workday, and/or by the incorporation of auxiliary processors into the line.

Descripció

Persones/entitats

Document relacionat

Versió de

Citació

Bautista, J., Alfaro, R., Batalla, C. Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement. "Expert systems with applications", 2015, vol. 42, núm. 22, p. 8896-8910.

Ajut

Forma part

Dipòsit legal

ISBN

ISSN

0957-4174

Altres identificadors

Referències