Implementing lean manufacturing system: ISM approach

Carregant...
Miniatura
El pots comprar en digital a:
El pots comprar en paper a:

Projectes de recerca

Unitats organitzatives

Número de la revista

Títol de la revista

ISSN de la revista

Títol del volum

Col·laborador

Editor

Tribunal avaluador

Realitzat a/amb

Càtedra / Departament / Institut

Tipus de document

Article

Data publicació

Editor

School of Industrial and Aeronautic Engineering of Terrassa (ETSEIAT). Universitat Politècnica de Catalunya (UPC)

Part de

Condicions d'accés

Accés obert

item.page.rightslicense

Creative Commons
Aquesta obra està protegida pels drets de propietat intel·lectual i industrial corresponents. Llevat que s'hi indiqui el contrari, els seus continguts estan subjectes a la llicència de Creative Commons: Reconeixement-NoComercial 3.0 Espanya

Assignatures relacionades

Assignatures relacionades

Datasets relacionats

Datasets relacionats

Projecte CCD

Abstract

Purpose: Lean Manufacturing System has emerged as an important area of research in Indian context. The requirement of Lean Manufacturing has increased due to defects in products (semi finished and finished) and subsequent increase in cost. In this context, this study is an attempt to develop a structural model of the variables, important to implement Lean Manufacturing System in Indian automobile industry.

Design/Methodology/Approach: Various variables of lean manufacturing system implementation have been identified from literature review and experts’ opinions. Contextual relationship among these identified variables has been set after carrying out brainstorming session. Further, classification of the variables has been carried out based upon the driving power and dependence. In addition to this, a structural model of variables to implement lean concept in Indian automobile industry has also been developed using Interpretive Structural Modeling (ISM) technique. Questionnaire based survey has also been conducted to rank these variables.

Findings: Eighteen variables have been identified from the literature and subsequent discussions with experts. Out of which, nine variables have been identified as dependent and nine variables have been identified as driver. No variable has been identified as linkage variable and autonomous variable. From the model developed, ‘Relative cost benefits’ has been identified as top level dependent variable and top management commitment as bottom level most independent variable.

Research limitations/Implications: The model so developed is a hypothetical model based upon experts’ opinions. The conclusions so drawn may be further modified to apply in real situation.

Practical implication: Clear understanding of interactions among these variables will help organizations to prioritize and manage these variables more effectively and efficiently to draw advantage from lean manufacturing system implementation.

Originality/value: Through this paper we contribute to identify the variables to implement lean manufacturing system in Indian automobile industry and prioritize them. The structured model developed will help to understand interdependence of the variables of lean manufacturing system implementation.

Descripció

Document relacionat

Citació

Kumar, Naveen [et al.]. Implementing lean manufacturing system: ISM approach. "Journal of Industrial Engineering and Management", Desembre 2013, vol. 6, núm. 4, p. 996-1012.

Ajut

Forma part

DOI

Dipòsit legal

ISBN

ISSN

2013-0953

Versió de l'editor

Altres identificadors

Referències