Programming an Application for Vehicle Prototype Planning

Carregant...
Miniatura
El pots comprar en digital a:
El pots comprar en paper a:

Projectes de recerca

Unitats organitzatives

Número de la revista

Títol de la revista

ISSN de la revista

Títol del volum

Correu electrònic de l'autor

Tutor / director

Tribunal avaluador

Realitzat a/amb

Tipus de document

Projecte/Treball Final de Carrera

Data

Condicions d'accés

Accés obert

item.page.rightslicense

Tots els drets reservats. Aquesta obra està protegida pels drets de propietat intel·lectual i industrial corresponents. Sense perjudici de les exempcions legals existents, queda prohibida la seva reproducció, distribució, comunicació pública o transformació sense l'autorització de la persona titular dels drets

Assignatures relacionades

Assignatures relacionades

Publicacions relacionades

Datasets relacionats

Datasets relacionats

Projecte CCD

Abstract

This project consists on programming an application, which is able to compute a list of Prototypes to be built by working with a list of Tests and given component constraints. The created “Prototype Planning” application generates different solutions throughout three different programming methods (each one of them was improved from the previous one). It also has three sub-applications integrated to test these versions with different input times. The application is written in C# using “Microsoft Visual Studio 2010 Ultimate”. The lists of Prototypes generated with version 1 gives a correct solution but the solution is not satisfactory, because there are many Prototypes that have a low duration at the end of the list. This problem is solved by creating version 2 with the implementation of a new programming method. As a result, the solution by version 2 is rather accurate to what the vehicle manufacturer needs. In version 3, not only the Prototype components are chosen, but also a time schedule is implemented. Despite this version giving a higher number of Prototypes, it is expected to find this result because the time limit of each Prototype was increasing. Finally, in version 4, a new hypothesis is computed to reduce the amount of Prototypes and to create a programming method more accurate to the reality. Prototype planning and scheduling is a complex field, which much research have been based on. Consequently, this application is far from producing the optimal solution to the problem, but by adding more improvements to the application, the final aim of obtaining the definitive application is possible.

Descripció

Provinença

Aquest document conté originàriament altre material i/o programari no inclòs en aquest lloc web

Titulació

ENGINYERIA INDUSTRIAL (Pla 1994)

Document relacionat

Citació

Ajut

DOI

Versió de l'editor

Altres identificadors

Referències