Increasing the Efficiency and Productivity in the Production of Low Voltage Switchboard Using Resource Constrained Project Scheduling

Carregant...
Miniatura
El pots comprar en digital a:
El pots comprar en paper a:

Projectes de recerca

Unitats organitzatives

Número de la revista

Títol de la revista

ISSN de la revista

Títol del volum

Cita com:

Col·laborador

Editor

Tribunal avaluador

Realitzat a/amb

Càtedra / Departament / Institut

Tipus de document

Article

Data publicació

Editor

OmniaScience

Part de

Condicions d'accés

Accés obert

Llicència

Creative Commons
Aquesta obra està protegida pels drets de propietat intel·lectual i industrial corresponents. Llevat que s'hi indiqui el contrari, els seus continguts estan subjectes a la llicència de Creative Commons: Reconeixement-NoComercial 3.0 Espanya

Assignatures relacionades

Assignatures relacionades

Datasets relacionats

Datasets relacionats

Projecte CCD

Abstract

Purpose: This research was made with the aim to give a scheduling proposal for the assembly activity and the proposal to allocate those activities into available resources using the resource-constrained project scheduling. Design/methodology/approach: The research begins with the problem exposition in the existing system on the Assembly Department of panel manufacturer company. To overcome the problem, several scheduling alternatives are formulated to yield better productivity. The performance of proposed system using RCPS is assessed using simulation method. Considering the circumstance of demand rate, the scenarios chosen are based on the parameter such as product departure cycle time, resource utilization, product output, and number of resource required. Findings: The scheduling alternatives provides the better arrangement of work elements in the assembly activity, especially for the product that represent the highest demand rate. For further research, the paper gives encouragement so that the application of RCPS can be used broader in the manufacturing area. Research limitations/implications: Although the findings were addressed to improve the existing system on the Assembly Department, the practical application haven’t been undergone and the performance assessment only based on the simulation method. Practical implications: By implementing the proposed scheduling, the company will experience several benefits. First, the company could increase its productivity by better utilization of its resources. Second, based on the simulation result, the company could avoid the backorder option while dealing with the high demand rate, and even can fully maximize its resource utilization without adding more worker or apply the overtime policy. Finally, the proposed scheduling that converted into the work instruction could help the company to perform the knowledge transfer from the existing worker or resigned worker to the newly-hired worker. Originality/value: The outcome of the research could become the guidance for other companies which have similar assembly system to apply the same method. This is the best paper that represents the application of RCPS in the large-sized component assemblies, where the walking worker is responsible for carrying tasks to each unmoved unit.

Descripció

Document relacionat

Citació

Tannady, H.; Maimury, Y. Increasing the Efficiency and Productivity in the Production of Low Voltage Switchboard Using Resource Constrained Project Scheduling. "Journal of Industrial Engineering and Management", Març 2018, vol. 11, núm. 1, p. 1-11.

Ajut

Forma part

Dipòsit legal

ISBN

ISSN

2013-0953

Versió de l'editor

Altres identificadors

Referències