Building a deep isolating wall by an existing rail tunnel

dc.contributor.authorMolins i Borrell, Climent
dc.contributor.authorLedesma Villalba, Alberto
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Enginyeria de la Construcció
dc.contributor.otherUniversitat Politècnica de Catalunya. Departament d'Enginyeria del Terreny, Cartogràfica i Geofísica
dc.date.accessioned2009-05-04T17:49:20Z
dc.date.available2009-05-04T17:49:20Z
dc.date.created2005
dc.date.issued2006
dc.description.abstractThis paper describes the design, construction and early performance of a retaining structure close to a subway tunnel in Barcelona. The excavation, about 16 m deep, was carried out in 2001 during the construction of a new hospital, and involved a rectangular area with the longer side (170 m) almost parallel to the tunnel. The design had to fulfil two requirements: first, the influence of the excavation on the existing tunnel had to be minimised; and, second, the new hospital had to be isolated from vibrations from the subway owing to the high sensitivity of the medical instruments. In order to achieve this, the retaining wall was designed to be independent of the main building, and movements during the excavation stages had to be controlled. In addition, the use of subhorizontal anchors was not allowed by the metro administration, and therefore the wall comprised a line of T-shaped panels linked to shorter intermediate panels excavated using a hydromill. The stability of the wall and bending resistance were provided by the buttressing effect of the forward-facing T and the compression in the panels and anchoring force provided by post-tensioning anchors drilled into the underlying bedrock through ducts installed in the rear section of the T panels. The wall was designed using a beam–spring model with ground parameters derived from in situ tests, and the interaction between the excavation and the tunnel was modelled using a plane-strain finite element analysis imposing the wall displacements on the section. Monitoring of the wall and the tunnel confirmed that the influence of the work on the neighbouring tunnel was negligible.
dc.description.peerreviewedPeer Reviewed
dc.format.extent8 p.
dc.identifier.citationMolins, C.; Ledesma, A. Building a deep isolating wall by an existing rail tunnel. Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 2006, vol. 159, july, no. 3, p. 219.
dc.identifier.doi10.1680/geng.2006.159.3.219
dc.identifier.urihttps://hdl.handle.net/2117/2868
dc.language.isoeng
dc.publisherInstitution of Civil Engineers
dc.relation.publisherversionhttp://www.icevirtuallibrary.com/doi/full/10.1680/geng.2006.159.3.219
dc.rights.accessOpen Access
dc.rights.licensenameAttribution-NonCommercial-NoDerivs 3.0 Spain
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.subjectÀrees temàtiques de la UPC::Enginyeria civil::Geotècnia::Túnels i excavacions
dc.subject.lcshRetaining walls
dc.subject.lcshTunnels
dc.subject.lemacTúnels ferroviaris
dc.subject.lemacMurs de contenció
dc.subject.otherisolating wall
dc.subject.otherrail tunnel
dc.titleBuilding a deep isolating wall by an existing rail tunnel
dc.typeArticle
dspace.entity.typePublication
local.personalitzacitaciotrue

Fitxers

Paquet original

Mostrant 1 - 1 de 1
Carregant...
Miniatura
Nom:
molins_proceedings_geotechnical_1.pdf
Mida:
486.24 KB
Format:
Adobe Portable Document Format