Browsing by Subject "Time study"
Now showing items 1-7 of 7
-
Buscando el procedimiento heurístico más adecuado para resolver un ejemplar concreto de un problema de optimización combinatoria, utilizando técnicas estadísticas
(2006-06)
Research report
Open AccessPara resolver un ejemplar concreto de un problema de optimización combinatoria determinado se pueden utilizar algoritmos heurísticos. Cuando se dispone de varios, se debería determinar cuál de todos es el procedimiento ... -
Disseny, estudi d'alternatives i optimització en el temps de mecanitzat d'una peça de fundició pel sector de l'automoció
(Universitat Politècnica de Catalunya, 2016-01)
Master thesis (pre-Bologna period)
Restricted access - confidentiality agreement -
Estudio de optimización de la sección de Puerta de Cochera L1 del servicio de Material Móvil de FMB.
(Universitat Politècnica de Catalunya, 2013-11)
Master thesis (pre-Bologna period)
Open Access
Covenantee: Transports Metropolitans de Barcelona¿Quién no se ha encontrado que a causa del trabajo le ha sido imposible conciliar su vida familiar? Horarios, turnos, trabajar festivos, vacaciones, etc. Y si no se ha encontrado, ¿conoce alguna persona que le ha pasado? ... -
Hotel room cleaning: time study and analysis of influential variables in a spanish hotel
(OmniaScience, 2021)
Article
Open AccessPurpose: Housekeeping is an important hotel process from the point-of-view of the number of work hours it takes and its impact on customer satisfaction. However, few previous scientific studies have addressed this topic ... -
Mathematical programming modelling of the response time variability problem
(2006-06)
Research report
Open AccessThe Response Time Variability Problem (RTVP) is a scheduling problem that has recently been defined in the literature. The RTVP has a broad range of real-life applications. For example, in the automobile industry it an be ... -
Reponse time variability
(2004-05)
Research report
Open AccessThis paper presents a work-in-progress on the response time variability problem. This problem occurs whenever events, jobs, clients or products need to be sequenced so as to minimize the variability of time they wait for ... -
Typical Schedule for Engineering (Onshore Projects)
(Universitat Politècnica de Catalunya, 2010-05)
Master thesis (pre-Bologna period)
Open AccessI made this final thesis in the planning section of Saipem, an engineering company specialized in the Oil& Gas industry. In this competitive business, planning team is a key element of the project. Indeed, price, technical ...