• Centralized management of wastewater quality of the sewage network in the Barcelona metropolitan area 

      Martínez, A; Orus, M. A.; Gullón Santos, Martín (2011)
      Comunicació de congrés
      Accés obert
      The following article presents the first phase of implantation of the Centralized Management project of wastewater quality. From the Inspection and Environmental Control Service the need to implant a project that integrates ...
    • PARSAR: A SAR processor implemented in a cluster of workstations 

      Martínez, A; Fraile, F; Mallorquí Franquet, Jordi Joan; Nogueira, L; Gabaldà, J; Broquetas Ibars, Antoni; González Colás, Antonio María (ESA Publications Division, 1997)
      Text en actes de congrés
      Accés obert
      A parallel SAR processor is presented in this paper. The target configuration is a cluster of UNIX workstations, available in most user sites. This fact allows to obtain an increased computing performance without the need ...
    • PARSAR: Parallelisation of a chirp scaling algorithm SAR processor 

      Martínez, A; Fraile, F; Mallorquí Franquet, Jordi Joan; Nogueira, J; Gavalda, J; Broquetas Ibars, Antoni; González Colás, Antonio María (Ch. Lengauer, M. Grielb, S. Gorlatch. BERLIN, NEW YORK, Springer-Verlag Cop.1997, 1997)
      Text en actes de congrés
      Accés obert
      A parallel SAR processor is presented in this paper. The target configuration is a cluster of UNIX workstations, available in most user sites. This fact allows to obtain an increased computing performance without the need ...