Now showing items 1-12 of 12

  • Adaptació del planificador quartz al projecte M@gin 

    Torrents Vila, Joan Ignasi (Universitat Politècnica de Catalunya, 2010-12-20)
    Master thesis (pre-Bologna period)
    Restricted access - confidentiality agreement
  • Assistent virtual de planificació 

    Lázaro Costa, Carlos (Universitat Politècnica de Catalunya, 2018-06)
    Bachelor thesis
    Open Access
    Aquest projecte té el propòsit d'ajudar a les persones a assolir els seus objectius a partir de la planificació del seu dia a dia de forma fàcil, mitjançant un assistent virtual.
  • Automatic I/O scheduler selection through online workload analysis 

    Nou Castell, Ramon; Giralt, Jacobo; Cortés, Toni (2013)
    Conference report
    Open Access
    I/O performance is a bottleneck for many workloads. The I/O scheduler plays an important role in it. It is typically configured once by the administrator and there is no selection that suits the system at every time. Every ...
  • Computational models and heuristic methods for Grid scheduling problems 

    Xhafa Xhafa, Fatos; Abraham, Ajith (Elsevier, 2010)
    Article
    Open Access
    In this paper we survey computational models for Grid scheduling problems and their resolution using heuristic and meta-heuristic approaches. Scheduling problems are at the heart of any Grid-like computational system. ...
  • Enterprise-wide scheduling framework supported by knowledge management 

    Capon Garcia, Elisabeth; Muñoz Mata, Edrisi; Lainez, Jose M.; Espuña Camarasa, Antonio; Puigjaner Corbella, Lluís (Elsevier, 2015)
    Conference report
    Restricted access - publisher's policy
    The scheduling function determines the amount of each product to produce, the allocation of equipment and resources to tasks, as well as the sequencing and timing of such tasks, in order to fulfill plan production objectives. ...
  • Implementació d'un sistema de gestió i alarma en una xarxa comunitària sense fils 

    Pica Stauss, Sergi (Universitat Politècnica de Catalunya, 2018-07-03)
    Bachelor thesis
    Open Access
    In this project, we will develop a management and alarm system in case of a failure of the network's nodes. So, it must control the availability of every node periodically and, if an error is detected, the system will ...
  • Planning with arithmetic and geometric attributes 

    Folqué Garcia, David (Universitat Politècnica de Catalunya, 2018-05-20)
    Bachelor thesis
    Open Access
    Covenantee:  New York University
    Often agents have to learn to act in environments with a mathematical structure. We propose to exploit such structure by augmenting the environment with user-specified attributes equipped with the appropriate geometric and ...
  • Reasoning-based evaluation of manipulation actions for efficient task planning 

    Akbari, Aliakbar; Ud Din, Muhayy; Rosell Gratacòs, Jan (Springer, 2015)
    Conference lecture
    Restricted access - publisher's policy
    To cope with the growing complexity of manipulation tasks, the way to combine and access information from high- and low-planning levels has recently emerged as an interesting challenge in robotics. To tackle this, the ...
  • Routine learning using statistics for robot’s tasks planning software 

    Troyano Feliu, Sandra (Universitat Politècnica de Catalunya, 2012)
    Master thesis (pre-Bologna period)
    Open Access
    Nowadays, the need to optimize time has caused a recent growth in the interest for home robots. Therefore, in this thesis the main household tasks feasible by a home robot are described and their usefulness is analysed by ...
  • Simulator planning tool development 2015 

    Bonhora Almeida de Carvalho, Joan (Universitat Politècnica de Catalunya / Institut Supérieur de l'Aéronautique et de l'Espace, 2015-09)
    Bachelor thesis
    Restricted access - author's decision
    Covenantee:  Airbus / Institut Supérieur de l'Aéronautique et de l'Espace
    This project took place within the Airbus EVAIS (Simulator Operations and Support) department in Toulouse (Airbus Saint Martin site). Beginning the 30th March 2015, the project had a total duration of 6 months. It was ...
  • Sistema de priorización de actividades 

    Roger I Andrés, Víctor (Universitat Politècnica de Catalunya, 2017-06-15)
    Bachelor thesis
    Open Access
    Imagínese el lector que se encuentra en la siguiente situación: su agenda está perfectamente cuadrada con las tareas programadas para ese día. Está llevando a cabo un informe sobre un trabajo que ha hecho su empresa y le ...
  • Workforce scheduling: a new model incorporating human factors 

    Othman, Mohammed; Gouw, Gerard J.; Bhuiyan, Nadia (School of Industrial and Aeronautic Engineering of Terrassa (ETSEIAT). Universitat Politècnica de Catalunya (UPC), 2012-12)
    Article
    Open Access
    Purpose: The majority of a company’s improvement comes when the right workers with the right skills, behaviors and capacities are deployed appropriately throughout a company. This paper considers a workforce scheduling ...