Exploració per tema "Cable-stayed bridges--Design and construction"
Ara es mostren els items 1-12 de 12
-
Analysis of cable-stayed bridge construction
(International Association for Bridge and Structural Engineers (IABSE), 2017)
Text en actes de congrés
Accés restringit per política de l'editorialOne of the most important causes of the rapid progress of cable-stayed bridges in recent decades is the development of the construction techniques that made their erection possible. Cantilever method and temporary support ... -
Analyzing the effects of the evolutionary erection in the service state of cable-stayed bridges built on temporary supports
(CRC Press, 2016)
Text en actes de congrés
Accés restringit per política de l'editorialThe stay forces in service of the cable-stayed bridges are usually defined in early stages of design, when the construction process has not even been conceived in detail yet. For this reason, the effects of the evolutionary ... -
Cálculo de las fuerzas de tesado óptimas en puentes atirantados
(Asociacion Científica del Hormigón Estructural (ACHE), 2011)
Text en actes de congrés
Accés restringit per política de l'editorialPara una determinada geometría, propiedades mecánicas y cargas exteriores, la consecución de una cierta distribución de fuerzas internas en un puente atirantado depende de la fuerza de pretensado de cada uno de los tirantes. ... -
Construction simulation of cable-stayed bridges
(CRC Press, 2018)
Text en actes de congrés
Accés restringit per política de l'editorialIn a staggered erected cable-stayed bridge made of concrete, time-dependent phenomena (suchas creep or shrinkage) effects might play an important role in both its geometry and its stress state. In fact, because of these ... -
Modelización por medio de programas comerciales del proceso constructivo de puentes atirantados construidos con apoyos provisionales
(2011)
Text en actes de congrés
Accés restringit per política de l'editorialEl presente trabajo muestra los resultados obtenidos en una reciente campaña experimental realizada con el objeto de estudiar la influencia de la cuantía de armado en el comportamiento frente a pandeo de pilares y paneles ... -
Modelling the construction of cable stayed bridges stressed with the strand by strand technique
(International Association for Bridge and Structural Engineers (IABSE), 2019)
Text en actes de congrés
Accés restringit per política de l'editorialThe temporary supports erection method is the most common way of building cable-stayed bridges. In this technique the bridge deck is first built over a set of temporary and permanent supports. Then, during the tensioning ... -
Nuevo algoritmo para analizar el proceso de tesado de puentes atirantados
(2011)
Text en actes de congrés
Accés restringit per política de l'editorialEl proceso constructivo de los puentes atirantados se suele modelizar “hacia atrás” debido a que su análisis es computacionalmente más sencillo. Sin embargo, esta modelización dificulta el análisis de los fenómenos ... -
Parametric simulation of non-symmetric cable-stayed bridges
(International Association for Bridge and Structural Engineers (IABSE), 2017)
Comunicació de congrés
Accés restringit per política de l'editorialThe rapid bloom of cable-stayed bridges has been propitiated by the development of erection techniques and improvements of construction materials. Nevertheless, the economic boom of the last decade has deflected attention ... -
Refuerzo de puentes por cambio de esquema estructural: optimización mediante algoritmo genético
(Asociacion Científica del Hormigón Estructural (ACHE), 2011)
Text en actes de congrés
Accés restringit per política de l'editorialLa presente comunicación entrega un estudio detallado del proceso constructivo y de tesado para el refuerzo de puentes con tipología longitudinal de vigas continuas convirtiéndolos en puentes en arco atirantado (tipo ... -
Simulation of the construction process of cable-stayed bridges from a direct approach
(International Association for Bridge and Structural Engineers (IABSE), 2014)
Text en actes de congrés
Accés restringit per política de l'editorialIn order to complete the design of any structure, an adequate simulation of its construction process is required. This simulation tries to guarantee that the structure can be built safely, that is to say that safety ... -
Simulation of the time-dependent phenomena effects in staggered erected cable-stayed bridges
(2015)
Text en actes de congrés
Accés restringit per política de l'editorialIn a staggered erected cable-stayed bridge made of concrete, time-dependent phenomena effects might play an important role in both its geometry and its stress state. In fact, because of these phenomena stays will indeed ... -
Tensioning process update for cable stayed bridges
(Springer, 2017)
Text en actes de congrés
Accés restringit per política de l'editorial