• Installation of a new hydropower plant in Ockelbo (Sweden) 

      Raurell Font, Albert; Reales Ferreres, Xavier (Universitat Politècnica de Catalunya / Högskolan I Gävle, 2009)
      Projecte/Treball Final de Carrera
      Accés restringit per decisió de l'autor
      The project consists on the reconstruction of an old and obsolete hydropower plant situated in Ockelbo (Sweden). To carry out this goal it is done firstly a land survey on the place and a preliminary study of which kind ...
    • Installation of a new hydropower plant in Ockelbo (Sweden) 

      Reales Ferreres, Xavier; Raurell Font, Albert (Universitat Politècnica de Catalunya / Högskolan I Gävle, 2009)
      Projecte/Treball Final de Carrera
      Accés restringit per decisió de l'autor
      The project consists on the reconstruction of an old and obsolete hydropower plant situated in Ockelbo (Sweden). To carry out this goal it is done firstly a land survey on the place and a preliminary study of which kind ...
    • Study of temperature raise in Gävleán river related to district cooling 

      Monleón Jiménez, Alex; Villas Roca, David (Universitat Politècnica de Catalunya / Högskolan I Gävle, 2009)
      Projecte/Treball Final de Carrera
      Accés restringit per decisió de l'autor
      This project is a preliminary study in order to build a small power plant, located beside to Gavleån River. It has been designed with the aim of cooling a district of Gävle city, Sweden. That big project is carried out by ...