• Feasibility of a hybrid bridge: suspension and cable – stayed model 

      Folqué Ceballos, Víctor (Universitat Politècnica de Catalunya, 2016-06-22)
      Projecte Final de Màster Oficial
      Accés obert
      The aim of this thesis is to respond to a need every day more emerging which is to create links connecting to open trade and social routes. The challenge is to avoid a distance of about 2.000 meters by constructing a ...