• Improved construction of medium-span concrete viaducts 

    Caballero, Ángel; Turmo Coderque, José (Czech Concrete Society, 2011)
    Texto en actas de congreso
    Acceso restringido por política de la editorial
    Concreting of span by span construction with travelling scaffolding is typically made in two phases. In the first phase, webs and bottom flange of the box girder are concreted. In the second phase, top flange is concreted. ...