• Analysis of a full scale in situ test simulating repository conditions 

      Gens Solé, Antonio; García Molina, Ángel; Olivella Pastallé, Sebastià; Alonso Pérez de Agreda, Eduardo; Huertas, F. (Wiley, 1998)
      Article
      Accés obert
      Coupled thermo-hydro-mechanical (THM) analyses have been used to examine the interacting phenomena associated with the simultaneous heating and hydration of an engineered bentonite barrier placed in a drift excavated in ...
    • Factors controlling rock–clay buffer interaction in a radioactive waste repository 

      Gens Solé, Antonio; Guimarães, Leonardo do N; García Molina, Ángel; Alonso Pérez de Agreda, Eduardo (Elsevier, 2002)
      Article
      Accés obert
      The paper examines the interaction between host rock and a clay-based engineered barrier in the context of deep underground disposal of high-level radioactive waste. A large scale ‘‘in situ’’ heating test currently under ...
    • Innovative solutions for intersection of TBM tunnel and station in Riyadh Line 5 metro 

      Ramos Schneider, Gonzalo; García Molina, Ángel; Torralba Mendiola, Víctor; Ainchil Lavín, Javier Pablo (Elsevier, 2018-10)
      Article
      Accés obert
      One of the main problems when constructing a metro line using a tunnel boring machine (TBM) is the coordination of the construction of the tunnel with the excavation of the stations that it will intersect, being possible ...
    • Soluciones innovadoras en el cruce de túneles y estaciones L5 Metro Riyadh 

      Torralba Mendiola, Víctor; García Molina, Ángel; Plana Aguilar, Dídac; Pérez Ayuso, David; Ramos Schneider, Gonzalo; Arranz Marco, Tomás; Ainchil Lavín, Javier Pablo (2017)
      Text en actes de congrés
      Accés restringit per política de l'editorial
    • Toronto-York Spadina subway extension tunnelling under Schulich Building 

      Ramos Schneider, Gonzalo; García Molina, Ángel; Ledesma Villalba, Alberto; Raveendra, Ravi; Polo Orodea, Tomás (2019-02)
      Article
      Accés obert
      Tunnelling under the York University Schulich Building was one of the milestones of the Toronto-York Spadina Subway Extension Project. The challenge was to bore the tunnel under a flagship building only one diameter below ...