Methodology for the economic optimisation of energy storage systems for frequency support in wind power plants
Visualitza/Obre
Report (1,032Mb) (Accés restringit)
Estadístiques de LA Referencia / Recolecta
Inclou dades d'ús des de 2022
Cita com:
hdl:2099.1/22489
Tipus de documentTreball Final de Grau
Data2014-03
Condicions d'accésAccés restringit per decisió de l'autor
Tots els drets reservats. Aquesta obra està protegida pels drets de propietat intel·lectual i
industrial corresponents. Sense perjudici de les exempcions legals existents, queda prohibida la seva
reproducció, distribució, comunicació pública o transformació sense l'autorització del titular dels drets
Abstract
This paper proposes a methodology for the economic optimisation of the sizing of Energy Storage Systems (ESSs) whilst enhancing the participation of Wind Power Plants (WPP) in network primary frequency
control support. A generalised approach was taken for the design of the methodology, so it can be applied to di erent energy markets and concerning di erent ESSs. The methodology includes the formulation and solving of a Linear Programming (LP) problem.
The methodology was applied to the particular case of a 50 MW WPP, equipped with Vanadium Redox Flow battery (VRB) in the UK energy market. Analysis is performed considering real data on the regular and
frequency response markets of UK. Data for wind power generation and energy storage costs are estimated from literature.
Results suggest that, under certain assumptions, ESSs can be pro table for the operator of a WPP that is providing frequency response. The ESS provides power reserves such that the WPP can generate close
to the maximum energy available. The solution of the optimisation problem establishes that an ESS with a power rating of 5.3 MW and energy capacity of about 3 MWh would be enough to provide such service
whilst maximizing the incomes for the WPP operator considering the regular and frequency regulation UK markets.