Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement
Visualitza/Obre
Cita com:
hdl:2117/88166
Tipus de documentArticle
Data publicació2015
Condicions d'accésAccés obert
Llevat que s'hi indiqui el contrari, els
continguts d'aquesta obra estan subjectes a la llicència de Creative Commons
:
Reconeixement-NoComercial-SenseObraDerivada 3.0 Espanya
ProjecteFACTOR HUMANO E INCERTIDUMBRE SOBRE LA SECUENCIACION Y EL EQUILIBRADO EN LINEAS DE MODELOS MIXTOS (MINECO-TIN2014-57497-P)
PROGRAMACION RESTRINGIDA DE OPERACIONES EN TALLERES HIBRIDOS INTEGRADOS SOBRE UNIDADES EN SECUENCIA. INDUSTRIA DEL AUTOMOVIL (ASPECTOS ECONOMICOS, JURIDICOS Y SOCIALES) (MICINN-DPI2010-16759)
PROGRAMACION RESTRINGIDA DE OPERACIONES EN TALLERES HIBRIDOS INTEGRADOS SOBRE UNIDADES EN SECUENCIA. INDUSTRIA DEL AUTOMOVIL (ASPECTOS ECONOMICOS, JURIDICOS Y SOCIALES) (MICINN-DPI2010-16759)
Abstract
Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come from collective agreements and therefore must be respected by both company and labor unions. The first model takes into account the saturation limit of the workstations, and the second model also includes the activation of the operators throughout the working day. Two computational experiments were carried out using a case study of the Nissan motor plant in Barcelona with two main objectives: (1) to study the repercussions of the saturation limit on the decrease in productivity on the line and (2) to evaluate the recovery of productivity on the line via both activation of operators, while maintaining the same quality in working conditions achieved by limiting the saturation, and auxiliary processors. By results we state that saturation limitation leads an important increase of work overload, which means average economic losses of 28,731.8 Euros/day. However, the productivity reduction may be counteracted by the work pace factor increase, at certain moments of workday, and/or by the incorporation of auxiliary processors into the line.
CitacióBautista, J., Alfaro, R., Batalla, C. Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement. "Expert systems with applications", 2015, vol. 42, núm. 22, p. 8896-8910.
ISSN0957-4174
Versió de l'editorhttp://www.sciencedirect.com/science/article/pii/S0957417415005047