Results of the RAMI analyses performed for the IFMIF accelerator facility in the engineering design phase
Visualitza/Obre
10.1016/j.fusengdes.2015.06.011
Inclou dades d'ús des de 2022
Cita com:
hdl:2117/85929
Tipus de documentArticle
Data publicació2015-10-01
Condicions d'accésAccés obert
Llevat que s'hi indiqui el contrari, els
continguts d'aquesta obra estan subjectes a la llicència de Creative Commons
:
Reconeixement-NoComercial-SenseObraDerivada 3.0 Espanya
Abstract
This paper presents a summary of the RAMI (Reliability Availability Maintainability Inspectability) analyses done for the IFMIF (International Fusion Materials Irradiation Facility) Accelerator facility in the Engineering Design Phase. The methodology followed, the analyses performed, the results obtained and the conclusions drawn are described. Moreover, the consequences of the incorporation of the RAMI studies in the IFMIF design are presented and the main outcomes of these analyses are shown. (C) 2015 Elsevier B.V. All rights reserved.
CitacióBargalló, E., Arroyo, J., Abal, J., Dies, J., de Blas, A., Tapia, C., Moya, J., Ibarra, A. Results of the RAMI analyses performed for the IFMIF accelerator facility in the engineering design phase. "Fusion engineering and design", 01 Octubre 2015, vol. 98-99, p. 1933-1936.
ISSN0920-3796
Col·leccions
Fitxers | Descripció | Mida | Format | Visualitza |
---|---|---|---|---|
2Results.pdf | 123,0Kb | Visualitza/Obre |