Capítols de llibre
Enviaments recents
-
Local search heuristics for the assembly line balancing problem with incompatibilities between tasks
(Institute of Electrical and Electronics Engineers (IEEE), 2000-04-24)
Capítol de llibre
Accés restringit per política de l'editorialThis paper deals with the assembly line balancing problem considering incompatibilities between the tasks with the aim of: first minimizing the number of workstations, and then minimizing the cycle time for the minimum ... -
Application of genetic algorithms to assembly sequence planning with limited resources
(IEEE Computer Society Conference Publishing Services (CPS), 1999-07-24)
Capítol de llibre
Accés restringit per política de l'editorialHeuristic procedures based on priority rules are quite frequently used to solve the multiple resource-constrained project-scheduling problem (RCPSP), i.e. task programming with limited resources. The rules are based on the ... -
Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies
(IEEE Computer Society Conference Publishing Services (CPS), 2009-11-17)
Capítol de llibre
Accés restringit per política de l'editorialProceedings of T2B.3 2009 IEEE International Symposium on Assembly and Manufacturing 17-20 November 2009, Suwon, Korea 978-1-4244-4628-5/09/$25.00 ©2009 IEEE Mixed-model sequencing problem with overload minimization ... -
Simultaneous Interconnection and Damping Assignment Passivity-Based Control: Two Practical Examples
(Springer Verlag, 2007-10)
Capítol de llibre
Accés obertPassivity-based control (PBC) is a generic name given to a family of controller design techniques that achieves system stabilization via the route of passivation, that is, rendering the closed-loop system passive with a ... -
Semi-Dynamic Demand in a Non-Permutation Flowshop with Constrained Resequencing Buffers.
(Springer Verlag, 2007-01)
Capítol de llibre
Accés obertThis work presents the performance comparison of two conceptually different approaches for a mixed model non-permutation flowshop production line. The demand is a semi-dynamic demand with a fixed job sequence for the first ...